Development of risk-based BIM integrated material resource control procedures to improve time performance on public facility construction projects in the Seribu Islands

This study aims to develop a material resource control procedure from a contractor's perspective that is integrated with 4D and 5D Building Information Modeling (BIM) technology, based on dominant risks at each stage, to improve project time performance. The research approach includes the identification and analysis of dominant risks, integration of activities with BIM, and data processing using the Delphi method and statistical analysis with SPSS version 27. The results of the study showed seven improvements to existing activities and the addition of nine new activities at the stages of shipping, receiving, storing, distributing, and using materials. Of all these activities, twelve can be integrated with BIM technology according to the results of risk validation. To ensure the feasibility of implementation, the developed procedure was tested through a case study on the Public Facility Construction (PFU) project in Gusung Klanceng. The results of the case study showed that the integrated BIM risk-based procedure was able to improve the accuracy of material requirement estimates and control project schedule changes, thereby supporting the achievement of time targets more optimally.

Authors

Institutions

Publication Details

Journal
International Research Journal of Engineering IT & Scientific Research
Published
2025-03-28
DOI
https://doi.org/10.21744/irjeis.v11n2.2506
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of risk-based BIM integrated material resource control procedures to improve time performance on public facility construction projects in the Seribu Islands

Yusuf Latief, Nicky Aulia Meiriza
International Research Journal of Engineering IT & Scientific Research
Management and Optimization Techniques
article

Development of risk-based BIM integrated material resource control procedures to improve time performance on public facility construction projects in the Seribu Islands

Yusuf Latief, Nicky Aulia Meiriza
article en

Abstract

This study aims to develop a material resource control procedure from a contractor's perspective that is integrated with 4D and 5D Building Information Modeling (BIM) technology, based on dominant risks at each stage, to improve project time performance. The research approach includes the identification and analysis of dominant risks, integration of activities with BIM, and data processing using the Delphi method and statistical analysis with SPSS version 27. The results of the study showed seven improvements to existing activities and the addition of nine new activities at the stages of shipping, receiving, storing, distributing, and using materials. Of all these activities, twelve can be integrated with BIM technology according to the results of risk validation. To ensure the feasibility of implementation, the developed procedure was tested through a case study on the Public Facility Construction (PFU) project in Gusung Klanceng. The results of the case study showed that the integrated BIM risk-based procedure was able to improve the accuracy of material requirement estimates and control project schedule changes, thereby supporting the achievement of time targets more optimally.

International Research Journal of Engineering IT & Scientific ResearchVol. 11(2)
University of Indonesia (ID)
Openalex Percentile: Top 92%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.