Redefining rabat's waterfront: negotiations and compromises in the BouRegreg Valley development project

After several decades of abandonment of its river, Rabat decided, at the start of the millennium, to implement a waterfront development policy. The fulfillment of the BouRegreg Valley development project marks a crucial turning point in the relationship between the city of Rabat and its waterfronts. In order to have the land base necessary to achieve the special development plan, the BouRegreg Development Agency undertook negotiations with several local actors, both individuals and associations. The negotiations between the agency and the fishermen have not been without tension or even conflict. This led the project owner to consider different arrangements and to make compromises with the main actors. From a broader perspective, this project illustrates the challenges related to empowering urban energy landscapes and the need to advance sustainability and resilience in evolving territories. By transforming the BouRegreg Valley, Rabat seeks to reconcile urban modernization with the preservation of river ecosystems while integrating local communities into the development process. The ability of stakeholders to negotiate and adapt projects to social and environmental realities is a key factor in ensuring a more inclusive and sustainable urban transition.

Authors

Institutions

Publication Details

Journal
Discover Cities
Published
2025-03-28
DOI
https://doi.org/10.1007/s44327-025-00067-1
Primary Topic
African Studies and Geopolitics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Redefining rabat's waterfront: negotiations and compromises in the BouRegreg Valley development project

Hicham Mouloudi
Discover Cities
African Studies and Geopolitics
article

Redefining rabat's waterfront: negotiations and compromises in the BouRegreg Valley development project

Hicham Mouloudi
article en

Abstract

After several decades of abandonment of its river, Rabat decided, at the start of the millennium, to implement a waterfront development policy. The fulfillment of the BouRegreg Valley development project marks a crucial turning point in the relationship between the city of Rabat and its waterfronts. In order to have the land base necessary to achieve the special development plan, the BouRegreg Development Agency undertook negotiations with several local actors, both individuals and associations. The negotiations between the agency and the fishermen have not been without tension or even conflict. This led the project owner to consider different arrangements and to make compromises with the main actors. From a broader perspective, this project illustrates the challenges related to empowering urban energy landscapes and the need to advance sustainability and resilience in evolving territories. By transforming the BouRegreg Valley, Rabat seeks to reconcile urban modernization with the preservation of river ecosystems while integrating local communities into the development process. The ability of stakeholders to negotiate and adapt projects to social and environmental realities is a key factor in ensuring a more inclusive and sustainable urban transition.

Discover CitiesVol. 2(1)
National School of Architecture (MA)
Openalex Percentile: Top 92%
African Studies and Geopolitics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Redefining rabat's waterfront: negotiations and compromises in the BouRegreg Valley development project — Hicham Mouloudi · Discover Cities (2025) | TGRS Research Map | TGRS