Evaluation of project implementation control in pre-construction stage to improve service provider performance in government procurement of goods and services

This study aims to determine what evaluation activity factors have an impact on the performance of service providers based on Circular Letter No. 18/SE/M/2021 which is carried out on the type of tender/auction with a single-file evaluation method for the kind of procurement of goods/services that uses the lowest price evaluation method of the post-qualification knockout system on projects with a unit price system. This study found that all independent variables, namely arithmetic corrections, conflicts of interest and indications of collusion, administration, qualifications, technical, price and specifications, design and changes, impact the performance of service providers, which are dependent variables. Technical evaluation activities and qualification evaluations have a dominant influence among other variables on the performance of service providers. This research produces modeling and improvements to improve the performance of service providers in the pre-construction stage, which is expected to minimize problems during the project.

Authors

Institutions

Publication Details

Journal
International Research Journal of Engineering IT & Scientific Research
Published
2025-03-28
DOI
https://doi.org/10.21744/irjeis.v11n2.2504
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of project implementation control in pre-construction stage to improve service provider performance in government procurement of goods and services

Yusuf Latief, Andysah Putera Utama Siahaan
International Research Journal of Engineering IT & Scientific Research
Construction Project Management and Performance
article

Evaluation of project implementation control in pre-construction stage to improve service provider performance in government procurement of goods and services

Yusuf Latief, Andysah Putera Utama Siahaan
article en

Abstract

This study aims to determine what evaluation activity factors have an impact on the performance of service providers based on Circular Letter No. 18/SE/M/2021 which is carried out on the type of tender/auction with a single-file evaluation method for the kind of procurement of goods/services that uses the lowest price evaluation method of the post-qualification knockout system on projects with a unit price system. This study found that all independent variables, namely arithmetic corrections, conflicts of interest and indications of collusion, administration, qualifications, technical, price and specifications, design and changes, impact the performance of service providers, which are dependent variables. Technical evaluation activities and qualification evaluations have a dominant influence among other variables on the performance of service providers. This research produces modeling and improvements to improve the performance of service providers in the pre-construction stage, which is expected to minimize problems during the project.

International Research Journal of Engineering IT & Scientific ResearchVol. 11(2)
University of Indonesia (ID)
Openalex Percentile: Top 93%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of project implementation control in pre-construction stage to improve service provider performance in government procurement of goods and services — Yusuf Latief, Andysah Putera Utama Siahaan · International Research Journal of Engineering IT & Scientific Research (2025) | TGRS Research Map | TGRS