Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices

Considering the characteristics of time-of-use tariffs and multi-shifts in real-life project execution scenarios, we present a multi-mode resource-constrained project scheduling problem with multi-shift and time-of-use tariffs (MRCPSP-MS-TOU). The MRCPSP-MS-TOU is a bi-objective scheduling problem that aims to simultaneously minimise both project duration and energy costs. In this problem, renewable resources are the critical equipment that consumes the most energy and can work continuously for multiple shifts. Activities that require critical equipment with high energy consumption are given priority for shifts with lower electricity prices under time-of-use tariffs. We construct a mixed integer linear programming model for the MRCPSP-MS-TOU. For small-scale projects, the ε-constraint method is implemented to solve the MRCPSP-MS-TOU using the Gurobi optimiser. For large-scale projects, this paper develops meta-heuristic algorithms in the framework of the two non-dominated sorting genetic algorithm versions. The MRCPSP-MS-TOU enables manufacturers and the construction industry to schedule projects using time-of-use tariffs and multi-shifts in a more efficient manner since it can control the intensity of energy consumption, reduce project costs, make full use of energy-intensive equipment, and effectively reduce order delivery time.

Authors

Institutions

Publication Details

Journal
International Journal of Production Research
Published
2024-09-18
DOI
https://doi.org/10.1080/00207543.2024.2403774
Citations
7
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
3.43

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices

Fang Xie, Wuliang Peng, Dongmin Yu
7 citations
International Journal of Production Research
Resource-Constrained Project Scheduling
3.43
article

Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices

Fang Xie, Wuliang Peng, Dongmin Yu
article en
7 citations

Abstract

Considering the characteristics of time-of-use tariffs and multi-shifts in real-life project execution scenarios, we present a multi-mode resource-constrained project scheduling problem with multi-shift and time-of-use tariffs (MRCPSP-MS-TOU). The MRCPSP-MS-TOU is a bi-objective scheduling problem that aims to simultaneously minimise both project duration and energy costs. In this problem, renewable resources are the critical equipment that consumes the most energy and can work continuously for multiple shifts. Activities that require critical equipment with high energy consumption are given priority for shifts with lower electricity prices under time-of-use tariffs. We construct a mixed integer linear programming model for the MRCPSP-MS-TOU. For small-scale projects, the ε-constraint method is implemented to solve the MRCPSP-MS-TOU using the Gurobi optimiser. For large-scale projects, this paper develops meta-heuristic algorithms in the framework of the two non-dominated sorting genetic algorithm versions. The MRCPSP-MS-TOU enables manufacturers and the construction industry to schedule projects using time-of-use tariffs and multi-shifts in a more efficient manner since it can control the intensity of energy consumption, reduce project costs, make full use of energy-intensive equipment, and effectively reduce order delivery time.

International Journal of Production ResearchVol. 63(7)
Yantai University (CN)
National Natural Science Foundation of China, Natural Science Foundation of Shandong Province
Openalex Percentile: Top 7%
Resource-Constrained Project Scheduling
3.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.