Decommissioning Small Modular Reactors (SMRs) poses distinct economic challenges compared to conventional nuclear power plants. This study uses a statistical technique, Principal Component Analysis (PCA) to reduce collected nine cost-driving data to two principal components, that explain 77.87% of the total variance. They were put into a Radial Basis Function (RBF) neural network as input to develop a predictive model for decommissioning costs, achieving a training error of 0.0016 and demonstrating strong predictive accuracy across 30 sample datasets. Based on result, dismantling the reactor pressure vessel (RPV) is a significant fixed cost, it is the largest contributor of overall expenses. Simulations show that increasing net electrical output (NEO) from 50 MWe to 350 MWe increases total decommissioning costs by only 6%, indicating the independence, and signing the importance of larger scale or co-located installations. This leads to the statement that targeted strategies are needed to optimize dismantling processes and waste management to achieve cost savings by taking the best use of modular design.

Authors

Institutions

Publication Details

Journal
Annals of Nuclear Energy
Published
2025-03-29
DOI
https://doi.org/10.1016/j.anucene.2025.111392
Primary Topic
Graphite, nuclear technology, radiation studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Neural network-based prediction of decommissioning costs for SMRs

Balázs Kocsis
Annals of Nuclear Energy
Graphite, nuclear technology, radiation studies
article

Neural network-based prediction of decommissioning costs for SMRs

Balázs Kocsis
article en

Abstract

Decommissioning Small Modular Reactors (SMRs) poses distinct economic challenges compared to conventional nuclear power plants. This study uses a statistical technique, Principal Component Analysis (PCA) to reduce collected nine cost-driving data to two principal components, that explain 77.87% of the total variance. They were put into a Radial Basis Function (RBF) neural network as input to develop a predictive model for decommissioning costs, achieving a training error of 0.0016 and demonstrating strong predictive accuracy across 30 sample datasets. Based on result, dismantling the reactor pressure vessel (RPV) is a significant fixed cost, it is the largest contributor of overall expenses. Simulations show that increasing net electrical output (NEO) from 50 MWe to 350 MWe increases total decommissioning costs by only 6%, indicating the independence, and signing the importance of larger scale or co-located installations. This leads to the statement that targeted strategies are needed to optimize dismantling processes and waste management to achieve cost savings by taking the best use of modular design.

Annals of Nuclear EnergyVol. 218
Center of Technology and Engineering for Nuclear Projects (RO), University of Pecs (HU)
Openalex Percentile: Top 96%
Graphite, nuclear technology, radiation studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.