Quality assurance and quality control of the underground cemented backfill system

This paper provides a discussion about the ultimate goal of a backfill system, and how a conventional quality assurance/quality control program supports the system in achieving this goal. The discussion then shifts to issues and limitations that a conventional system can face and provides some commentary on how the conventional system can be improved.

Authors

Publication Details

Journal
Paste/˜Pœaste
Published
2025-01-01
DOI
https://doi.org/10.36487/acg_repo/2555_0.02
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Quality assurance and quality control of the underground cemented backfill system

R.H. Veenstra
Paste/˜Pœaste
Geotechnical and Geomechanical Engineering
article

Quality assurance and quality control of the underground cemented backfill system

R.H. Veenstra
article en

Abstract

This paper provides a discussion about the ultimate goal of a backfill system, and how a conventional quality assurance/quality control program supports the system in achieving this goal. The discussion then shifts to issues and limitations that a conventional system can face and provides some commentary on how the conventional system can be improved.

Paste/˜Pœaste
Industry, innovation and infrastructure
Openalex Percentile: Top 93%
Geotechnical and Geomechanical Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Quality assurance and quality control of the underground cemented backfill system — R.H. Veenstra · Paste/˜Pœaste (2025) | TGRS Research Map | TGRS