Effect of Stepwise Increase in Tailings Deposition on Tailings Dam Stability

Tailings from metalliferous ore processing are stored in tailing-storage facilities. Fresh tailings contain high content of water, and this may contribute to the instability of the facilities. One way of depositing tailings into the facilities is to lay a layer of fresh tailings on top of previously deposited tailings and let the newly deposited tailings settle down for some time before another layer is laid. This paper utilises GeoStudio’s software packages SEEP/W, SLOPE/W, and SIGMA/W to analyse the effects of such deposition processing on the stability of a tailing dam. It is found that, generally, as more layers are added, the factor of safety of the upstream slope surface of the dam embarkment increases, while the factor of the safety of the downstream slope surface is not affected. The thickness of the layers does not affect the factor of safety of the downstream slope surface. The factor of safety of the upstream slope surface is affected by the thickness of the layers: the thicker the layers, the higher the factor of safety. Hydraulic conductivity is one of the factors that influence the settlement times of the deposited tailing layers.

Authors

Institutions

Publication Details

Journal
Minerals
Published
2025-03-27
DOI
https://doi.org/10.3390/min15040346
Citations
3
Primary Topic
Tailings Management and Properties
Type
article
Field-Weighted Citation Impact
2.86
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effect of Stepwise Increase in Tailings Deposition on Tailings Dam Stability

Manoj Khanal, Jingyu Shi, Qingdong Qu
3 citations
Minerals
Tailings Management and Properties
2.86
article

Effect of Stepwise Increase in Tailings Deposition on Tailings Dam Stability

Manoj Khanal, Jingyu Shi, Qingdong Qu
article en
3 citations

Abstract

Tailings from metalliferous ore processing are stored in tailing-storage facilities. Fresh tailings contain high content of water, and this may contribute to the instability of the facilities. One way of depositing tailings into the facilities is to lay a layer of fresh tailings on top of previously deposited tailings and let the newly deposited tailings settle down for some time before another layer is laid. This paper utilises GeoStudio’s software packages SEEP/W, SLOPE/W, and SIGMA/W to analyse the effects of such deposition processing on the stability of a tailing dam. It is found that, generally, as more layers are added, the factor of safety of the upstream slope surface of the dam embarkment increases, while the factor of the safety of the downstream slope surface is not affected. The thickness of the layers does not affect the factor of safety of the downstream slope surface. The factor of safety of the upstream slope surface is affected by the thickness of the layers: the thicker the layers, the higher the factor of safety. Hydraulic conductivity is one of the factors that influence the settlement times of the deposited tailing layers.

MineralsVol. 15(4)
Commonwealth Scientific and Industrial Research Organisation (AU), Mineral Resources (AU), Australian Resources Research Centre (AU)
Openalex Percentile: Top 11%
Tailings Management and Properties
2.86
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.