Perencanaan Ulang Overpass Cabe Raya, Ciputat, Tangerang Selatan Berbasis BIM

BIM (Building Information Modeling) includes various important information in design. Modeling with BIM technology used in infrastructure planning is a form of technological development that presents digital physical and functional planning objects. The Cabe Raya overpass was built with the aim of reducing the congestion that occurs on the Pondok Cabe Raya road, South Tangerang. This planning aims to re-plan the construction of the Cabe Raya overpass based on BIM by modeling 4D using the Tekla Structures application. This re-planning will carry out analysis of data obtained from the project site review. The loading method refers to the Bridge and Highway Loading Standards (SNI 1725 2016). This planning goes through the main stages, namely, analysis of loading data then planning manual structural calculations, planning the cost budget design using Ms. Projects. It is planned that from the results of the preparation of the budget plan that will be needed is Rp. 8,930,872,000.00 and is planned to be completed in approximately 8 months.

Authors

Institutions

Publication Details

Journal
Jurnal Sipil dan Arsitektur
Published
2025-03-29
DOI
https://doi.org/10.14710/pilars.3.1.2025.67-76
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Ulang Overpass Cabe Raya, Ciputat, Tangerang Selatan Berbasis BIM

Asri Nurdiana, Riza Susanti, Galang Huda Nugraha, Onyvia Whika Elfrida
Jurnal Sipil dan Arsitektur
Geotechnical and construction materials studies
article

Perencanaan Ulang Overpass Cabe Raya, Ciputat, Tangerang Selatan Berbasis BIM

Asri Nurdiana, Riza Susanti, Galang Huda Nugraha, Onyvia Whika Elfrida
article en

Abstract

BIM (Building Information Modeling) includes various important information in design. Modeling with BIM technology used in infrastructure planning is a form of technological development that presents digital physical and functional planning objects. The Cabe Raya overpass was built with the aim of reducing the congestion that occurs on the Pondok Cabe Raya road, South Tangerang. This planning aims to re-plan the construction of the Cabe Raya overpass based on BIM by modeling 4D using the Tekla Structures application. This re-planning will carry out analysis of data obtained from the project site review. The loading method refers to the Bridge and Highway Loading Standards (SNI 1725 2016). This planning goes through the main stages, namely, analysis of loading data then planning manual structural calculations, planning the cost budget design using Ms. Projects. It is planned that from the results of the preparation of the budget plan that will be needed is Rp. 8,930,872,000.00 and is planned to be completed in approximately 8 months.

Jurnal Sipil dan ArsitekturVol. 3(1)
Diponegoro University (ID)
Openalex Percentile: Top 94%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.