Setup experience in commissioning hydraulic control system of turbine K -1200-6,8/50

The construction of new nuclear power plants under the NPP-2006 project required Leningradsky Metallichesky Zavod (LMZ) to implement an electronic and hydraulic turbine regulation and protection system (TRPS) in the design of a large capacity condensing turbine K-1200-6,8/50, based on the experience, design and circuit solutions for a similar system of a high-speed turbine-analogue K-1000-60-3000 manufactured by LMZ. Despite the preservation of the turbine layout in relation to the turbine-analogue (2LP module + HP module + 2LP module), the turbine control concept through the TRPS and the available references at the stage of commissioning of the Novovoronezh NPP-2 power units (before the power unit was turned on to the grid), as experience has shown, there were cases of incorrect operation of the TRPS due to the ambiguity of the assembly or hidden inconsistencies. The elimination of the causes of incorrect operation of hydraulic assemblies is often directly related to the search for the root cause "from the inside", i.e. disassembly of equipment is required. The presented article shows cases of incorrect operation of the TRPS and ways to solve them from the experience of commissioning on a high-capacity turbine K-1200-6,8/50 with a brief description of the problematic TRPS hydraulic components, the amount of refinement of structural elements. The experience of commissioning described in this article is still relevant today due to regular scheduled preventive repairs at commissioned power units of the NPP-2006 project, during which a routine audit of the hydraulic elements of the steam distribution organs is carried out, as well as a pre-start check of the interaction of the hydraulic and electronic parts of the TRPS. In addition, the commissioning of nuclear power plants with turbine K-1200-6,8/50 is currently underway abroad (in People's Republic of Bangladesh) where the described experience can be applied on occasion.

Authors

Institutions

Publication Details

Journal
Global Nuclear Safety
Published
2025-03-26
DOI
https://doi.org/10.26583/gns-2025-01-04
Citations
1
Primary Topic
Advanced Power Generation Technologies
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Setup experience in commissioning hydraulic control system of turbine K -1200-6,8/50

N. G. Volkov, A. A. Sorokin, A. I. Bodrov, V. V. Filatov et al.
1 citations
Global Nuclear Safety
Advanced Power Generation Technologies
0.73
article

Setup experience in commissioning hydraulic control system of turbine K -1200-6,8/50

N. G. Volkov, A. A. Sorokin, A. I. Bodrov, V. V. Filatov, A. A. Belyakov, A. V. Varzanov
article en
1 citations

Abstract

The construction of new nuclear power plants under the NPP-2006 project required Leningradsky Metallichesky Zavod (LMZ) to implement an electronic and hydraulic turbine regulation and protection system (TRPS) in the design of a large capacity condensing turbine K-1200-6,8/50, based on the experience, design and circuit solutions for a similar system of a high-speed turbine-analogue K-1000-60-3000 manufactured by LMZ. Despite the preservation of the turbine layout in relation to the turbine-analogue (2LP module + HP module + 2LP module), the turbine control concept through the TRPS and the available references at the stage of commissioning of the Novovoronezh NPP-2 power units (before the power unit was turned on to the grid), as experience has shown, there were cases of incorrect operation of the TRPS due to the ambiguity of the assembly or hidden inconsistencies. The elimination of the causes of incorrect operation of hydraulic assemblies is often directly related to the search for the root cause "from the inside", i.e. disassembly of equipment is required. The presented article shows cases of incorrect operation of the TRPS and ways to solve them from the experience of commissioning on a high-capacity turbine K-1200-6,8/50 with a brief description of the problematic TRPS hydraulic components, the amount of refinement of structural elements. The experience of commissioning described in this article is still relevant today due to regular scheduled preventive repairs at commissioned power units of the NPP-2006 project, during which a routine audit of the hydraulic elements of the steam distribution organs is carried out, as well as a pre-start check of the interaction of the hydraulic and electronic parts of the TRPS. In addition, the commissioning of nuclear power plants with turbine K-1200-6,8/50 is currently underway abroad (in People's Republic of Bangladesh) where the described experience can be applied on occasion.

Global Nuclear SafetyVol. 15(1)
Ivanovo State Power University (RU), Private Machines (United States) (US)
Openalex Percentile: Top 30%
Advanced Power Generation Technologies
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.