A Graph Embedding Algorithm Based on Reinforcement Learning for Solving Fuzzy Multi-Objective Flexible Job Shop Scheduling Problem

This study delves into the multi-objective flexible job-shop scheduling problem with fuzzy time (MOFFJSP), addressing complex and dynamic production environments, with the goal of minimizing the maximum completion time and total machine workload (TMW). A graph embedding algorithm based on reinforcement learning (GEARL) is proposed in this article, consisting of four modules: population initialization, fuzzy disjunctive graph, policy model, and solution set optimization processing. Diverse initial populations are constructed using different rules tailored to the problem. A fuzzy disjunctive graph is designed to transform individual data information into graph information. Graph embedding technology is utilized to extract individual feature information and generate corresponding optimization strategies through the policy model. Solution set optimization processing involves performing non-dominated sorting on the entire population to filter out advantageous individuals to guide subsequent optimization directions. Experimental results demonstrate that the GEARL algorithm exhibits significant advantages in solving the MOFFJSP.

Publication Details

Journal
Industrial Engineering and Innovation Management
Published
2025-01-01
DOI
https://doi.org/10.23977/ieim.2025.080114
Primary Topic
Elevator Systems and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Graph Embedding Algorithm Based on Reinforcement Learning for Solving Fuzzy Multi-Objective Flexible Job Shop Scheduling Problem

Industrial Engineering and Innovation Management
Elevator Systems and Control
article

A Graph Embedding Algorithm Based on Reinforcement Learning for Solving Fuzzy Multi-Objective Flexible Job Shop Scheduling Problem

article en

Abstract

This study delves into the multi-objective flexible job-shop scheduling problem with fuzzy time (MOFFJSP), addressing complex and dynamic production environments, with the goal of minimizing the maximum completion time and total machine workload (TMW). A graph embedding algorithm based on reinforcement learning (GEARL) is proposed in this article, consisting of four modules: population initialization, fuzzy disjunctive graph, policy model, and solution set optimization processing. Diverse initial populations are constructed using different rules tailored to the problem. A fuzzy disjunctive graph is designed to transform individual data information into graph information. Graph embedding technology is utilized to extract individual feature information and generate corresponding optimization strategies through the policy model. Solution set optimization processing involves performing non-dominated sorting on the entire population to filter out advantageous individuals to guide subsequent optimization directions. Experimental results demonstrate that the GEARL algorithm exhibits significant advantages in solving the MOFFJSP.

Industrial Engineering and Innovation ManagementVol. 8(1)
Decent work and economic growth
Openalex Percentile: Top 94%
Elevator Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.