Dispatching Locomotives Across a Railway Junction Using the Intelligent Planning System

Purpose: The effective use of locomotives at a railway junction to minimize costs and downtime and maximize the locomotive fleet productivity and efficiency. This paper describes a mathematical model for optimizing locomotive turnover, which will allow finding a balance between revenues and costs of operating and servicing locomotives. Methods: Optimization of locomotive fleet operation is considered with the methods for linear programming and locomotive scheduling theory. Results: Minimizing the downtime of locomotives and their maximum loading will require accurate planning of shunting work and timely movement of locomotives to the desired sections. To ensure a balance between shunting work and train operation, it is mportant to allocate locomotives appropriately. Timely delivery of locomotives to trains for dispatch requires dispatchers’ coordinated actions. This will lead to minimizing the locomotive downtime and maximizing the time in operation. Practical significance: The results of the work are important for the effective management of locomotive operation in railway transportation, which makes it more attractive for both shippers and passengers.

Authors

Institutions

Publication Details

Journal
Bulletin of scientific research results
Published
2025-03-25
DOI
https://doi.org/10.20295/2223-9987-2025-1-62-71
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Dispatching Locomotives Across a Railway Junction Using the Intelligent Planning System

Ramazon Bozorov, Samandar Sattorov, Shukhrat Saidivaliev
Bulletin of scientific research results
Railway Systems and Energy Efficiency
article

Dispatching Locomotives Across a Railway Junction Using the Intelligent Planning System

Ramazon Bozorov, Samandar Sattorov, Shukhrat Saidivaliev
article en

Abstract

Purpose: The effective use of locomotives at a railway junction to minimize costs and downtime and maximize the locomotive fleet productivity and efficiency. This paper describes a mathematical model for optimizing locomotive turnover, which will allow finding a balance between revenues and costs of operating and servicing locomotives. Methods: Optimization of locomotive fleet operation is considered with the methods for linear programming and locomotive scheduling theory. Results: Minimizing the downtime of locomotives and their maximum loading will require accurate planning of shunting work and timely movement of locomotives to the desired sections. To ensure a balance between shunting work and train operation, it is mportant to allocate locomotives appropriately. Timely delivery of locomotives to trains for dispatch requires dispatchers’ coordinated actions. This will lead to minimizing the locomotive downtime and maximizing the time in operation. Practical significance: The results of the work are important for the effective management of locomotive operation in railway transportation, which makes it more attractive for both shippers and passengers.

Bulletin of scientific research resultsVol. 2025(1)
Tashkent State Transport University (UZ), Petersburg State Transport University (RU)
Openalex Percentile: Top 93%
Railway Systems and Energy Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.