Research on Risk Assessment of Urban Underground Pipe Gallery during Construction Period

Since the promotion and construction of urban underground comprehensive pipe gallery in China, various regions have increased their investment in the construction of comprehensive pipe gallery projects. However, due to the lack of practical experience, there are still many problems in the construction of comprehensive pipe gallery, such as planning and design, construction safety, and so on. In view of these problems, this paper analyzes and evaluates the risk of utility tunnel construction period. Firstly, the risk factors during the construction period of the utility tunnel are identified and filtered. Secondly, the analytic hierarchy process and entropy weight method are used to determine the subjective and objective weights of risk evaluation indicators, and the combination weighting method is used to optimize the index weights. Then, a risk assessment model of utility tunnel construction period based on matter-element extension theory is established. Finally, combined with the engineering example, the overall risk level of the utility tunnel project during the construction period is determined, and the corresponding risk management suggestions are put forward for the risk factors with more prominent risk levels.

Authors

Institutions

Publication Details

Published
2025-03-26
DOI
https://doi.org/10.1061/9780784485910.047
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Risk Assessment of Urban Underground Pipe Gallery during Construction Period

Hongbing Li, Hang Yao, Jun Fang
Underground infrastructure and sustainability
article

Research on Risk Assessment of Urban Underground Pipe Gallery during Construction Period

Hongbing Li, Hang Yao, Jun Fang
article en

Abstract

Since the promotion and construction of urban underground comprehensive pipe gallery in China, various regions have increased their investment in the construction of comprehensive pipe gallery projects. However, due to the lack of practical experience, there are still many problems in the construction of comprehensive pipe gallery, such as planning and design, construction safety, and so on. In view of these problems, this paper analyzes and evaluates the risk of utility tunnel construction period. Firstly, the risk factors during the construction period of the utility tunnel are identified and filtered. Secondly, the analytic hierarchy process and entropy weight method are used to determine the subjective and objective weights of risk evaluation indicators, and the combination weighting method is used to optimize the index weights. Then, a risk assessment model of utility tunnel construction period based on matter-element extension theory is established. Finally, combined with the engineering example, the overall risk level of the utility tunnel project during the construction period is determined, and the corresponding risk management suggestions are put forward for the risk factors with more prominent risk levels.

Wuhan University of Technology (CN)
Sustainable cities and communities
Openalex Percentile: Top 95%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on Risk Assessment of Urban Underground Pipe Gallery during Construction Period — Hongbing Li, Hang Yao, et al. · (2025) | TGRS Research Map | TGRS