Infrastructure Adequacy for Electricity Trading in East Africa

A well designed, managed, reliable and adequate electricity generation and transmission system infrastructure is essential for inter-country electricity market integration. This paper tracks progress in establishing the infrastructure needed to facilitate electricity trading in East Africa common market since its formation in 2010. Using data on electricity infrastructure development targets set in the EAC electricity infrastructure Master Plan 2013- 2023 and the actual infrastructure delivered by 2022, we conducted Earned Value Analysis (EVA) for generation and transmission infrastructure projects. This aimed at establishing whether the completed infrastructure can adequately facilitate electricity exchange across EAC market. Findings show that by 2022 the region had realized 54% of the 12,567MW planned generation capacity, and 211% of transmission network targets. Investment inflows for establishing infrastructure have been faster than anticipated with actual variance of 325%. This triggered 47% earned value in surplus load worth US$357million of trade, despite actual electricity trading not happening at the same pace. We construed a set of merit-order conditions that can guide iterative planning to synchronize generation infrastructure with cross-border infrastructure for trade efficiency.

Authors

Institutions

Publication Details

Published
2025-03-25
DOI
https://doi.org/10.56279/orseaj.c2024.21
Primary Topic
Energy and Environment Impacts
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Infrastructure Adequacy for Electricity Trading in East Africa

Muhumuza Ezra Rubanda, Muyiwa S. Adaramola, Livingstone Senyonga, Mohammed Ngoma
Energy and Environment Impacts
article

Infrastructure Adequacy for Electricity Trading in East Africa

Muhumuza Ezra Rubanda, Muyiwa S. Adaramola, Livingstone Senyonga, Mohammed Ngoma
article en

Abstract

A well designed, managed, reliable and adequate electricity generation and transmission system infrastructure is essential for inter-country electricity market integration. This paper tracks progress in establishing the infrastructure needed to facilitate electricity trading in East Africa common market since its formation in 2010. Using data on electricity infrastructure development targets set in the EAC electricity infrastructure Master Plan 2013- 2023 and the actual infrastructure delivered by 2022, we conducted Earned Value Analysis (EVA) for generation and transmission infrastructure projects. This aimed at establishing whether the completed infrastructure can adequately facilitate electricity exchange across EAC market. Findings show that by 2022 the region had realized 54% of the 12,567MW planned generation capacity, and 211% of transmission network targets. Investment inflows for establishing infrastructure have been faster than anticipated with actual variance of 325%. This triggered 47% earned value in surplus load worth US$357million of trade, despite actual electricity trading not happening at the same pace. We construed a set of merit-order conditions that can guide iterative planning to synchronize generation infrastructure with cross-border infrastructure for trade efficiency.

Norwegian University of Life Sciences (NO), Makerere University (UG)
Openalex Percentile: Top 96%
Energy and Environment Impacts
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.