Determination of Control Valve Maintenance Interval using RCM Method at Pertamina Refinery Unit V Balikpapan

The Pertamina Oil Refinery Unit V in Balikpapan is a crucial infrastructure in Indonesia’s oil and gas industry. One of the critical components in this refinery is the control valve, specifically the control valve with tag number 02-LCV-084, which has experienced frequent malfunctions. This study aims to determine the optimal maintenance intervals for the control valve using the Reliability Centered Maintenance (RCM) methodology. The research involves analyzing two years of failure data and applying techniques such as Failure Mode and Effect Analysis (FMEA), Time to Failure (TTF), and Time to Repair (TTR) calculations. The results indicate that the seat ring requires maintenance every 757 hours (32 days), the plug every 874 hours (37 days), and the stem every 1694 hours (70 days). These maintenance intervals provide important insights for improving the operational efficiency of the refinery’s equipment by preventing unscheduled downtime and reducing repair costs. The implementation of RCM in determining maintenance intervals can enhance the reliability and longevity of critical equipment in industrial environments.

Authors

Institutions

Publication Details

Journal
Semarak International Journal of Mechanical Precision Engineering
Published
2025-03-15
DOI
https://doi.org/10.37934/sijmpe.2.1.110
Primary Topic
Industrial Automation and Control Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determination of Control Valve Maintenance Interval using RCM Method at Pertamina Refinery Unit V Balikpapan

Sapta Asmal, Hasnida Ab-Samat, Muhammad Zainul Arifin, Irwan Setiawan et al.
Semarak International Journal of Mechanical Precision Engineering
Industrial Automation and Control Systems
article

Determination of Control Valve Maintenance Interval using RCM Method at Pertamina Refinery Unit V Balikpapan

Sapta Asmal, Hasnida Ab-Samat, Muhammad Zainul Arifin, Irwan Setiawan, Saiful Saiful
article en

Abstract

The Pertamina Oil Refinery Unit V in Balikpapan is a crucial infrastructure in Indonesia’s oil and gas industry. One of the critical components in this refinery is the control valve, specifically the control valve with tag number 02-LCV-084, which has experienced frequent malfunctions. This study aims to determine the optimal maintenance intervals for the control valve using the Reliability Centered Maintenance (RCM) methodology. The research involves analyzing two years of failure data and applying techniques such as Failure Mode and Effect Analysis (FMEA), Time to Failure (TTF), and Time to Repair (TTR) calculations. The results indicate that the seat ring requires maintenance every 757 hours (32 days), the plug every 874 hours (37 days), and the stem every 1694 hours (70 days). These maintenance intervals provide important insights for improving the operational efficiency of the refinery’s equipment by preventing unscheduled downtime and reducing repair costs. The implementation of RCM in determining maintenance intervals can enhance the reliability and longevity of critical equipment in industrial environments.

Semarak International Journal of Mechanical Precision EngineeringVol. 2(1)
Universiti Sains Malaysia (MY), Hasanuddin University (ID)
Openalex Percentile: Top 94%
Industrial Automation and Control Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.