Pavement Performance Prediction of Semarang–Solo Toll Road, Indonesia, using Markov Chain Model

Roads are one of the infrastructures that significantly impact a country's economic growth. The condition of the roads usually decreases due to increasing vehicle volumes. Predicting road conditions is essential for planning future maintenance. This study aims to evaluate the pavement conditions over five years using Markov chain model for five sections of the Semarang-Solo toll road, Indonesia. Two scenarios are selected in the simulation, without-handling and with-handling programs. The results show that the historical data used to compile the transition probability matrix (TPM) from the Markov model greatly influences the simulation results in both scenarios. In addition, the simulation results also indicate that the inner lane for all segments of Semarang - Solo direction is the most crucial because these segments have a relatively high rate of decline in road steadiness and a shorter cycle time for implementing the handling program.

Authors

Institutions

Publication Details

Journal
Civil Engineering Dimension
Published
2025-03-21
DOI
https://doi.org/10.9744/ced.27.1.12-21
Citations
1
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.95
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pavement Performance Prediction of Semarang–Solo Toll Road, Indonesia, using Markov Chain Model

Bagus Hario Setiadji, Bambang Riyanto, Hulfa Istikomah
1 citations
Civil Engineering Dimension
Infrastructure Maintenance and Monitoring
0.95
article

Pavement Performance Prediction of Semarang–Solo Toll Road, Indonesia, using Markov Chain Model

Bagus Hario Setiadji, Bambang Riyanto, Hulfa Istikomah
article en
1 citations

Abstract

Roads are one of the infrastructures that significantly impact a country's economic growth. The condition of the roads usually decreases due to increasing vehicle volumes. Predicting road conditions is essential for planning future maintenance. This study aims to evaluate the pavement conditions over five years using Markov chain model for five sections of the Semarang-Solo toll road, Indonesia. Two scenarios are selected in the simulation, without-handling and with-handling programs. The results show that the historical data used to compile the transition probability matrix (TPM) from the Markov model greatly influences the simulation results in both scenarios. In addition, the simulation results also indicate that the inner lane for all segments of Semarang - Solo direction is the most crucial because these segments have a relatively high rate of decline in road steadiness and a shorter cycle time for implementing the handling program.

Civil Engineering DimensionVol. 27(1)
Diponegoro University (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 28%
Infrastructure Maintenance and Monitoring
0.95
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Pavement Performance Prediction of Semarang–Solo Toll Road, Indonesia, using Markov Chain Model — Bagus Hario Setiadji, Bambang Riyanto, et al. · Civil Engineering Dimension (2025) | TGRS Research Map | TGRS