Dynamic risk assessment for subway station excavation near existing buildings using spherical fuzzy numbers

Purpose Constructing subway stations near existing buildings is a complex engineering challenge. To identify high-risk factors and guide safe construction, a risk factor identification and safety evaluation system is needed. Design/methodology/approach Compared to intuitionistic fuzzy sets, Pythagorean fuzzy sets and similar approaches, spherical fuzzy sets provide a more nuanced representation of fuzzy information. They offer greater computational flexibility and precision in complex fuzzy decision-making scenarios. Building on this, the study constructs a full-cycle dynamic risk factor identification and safety evaluation system based on spherical fuzzy numbers, triangular fuzzy numbers and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method. The model uses expert coefficients to measure the weight of different expert judgments and the coefficient of variation to assess the consistency of expert judgments. By combining subjective expert judgments with objective on-site data, the evaluation system is built through three steps: system establishment, data processing and risk factor identification. Findings The applicability of the model was validated through the construction of the Xueshan Road Station of the Jinan Metro. An evaluation system comprising four criteria and 14 risk factors was established, covering geological conditions, construction monitoring, buildings and technical and management variables. A comprehensive evaluation of six construction stages was conducted, and the identified high-risk factors were consistent with the on-site conditions. Sensitivity analysis further verified the accuracy and stability of the model. Originality/value The model is applicable to various engineering challenges, providing a robust basis for early warning of construction risks.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-03-26
DOI
https://doi.org/10.1108/ecam-08-2024-0994
Citations
1
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
1.30
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Dynamic risk assessment for subway station excavation near existing buildings using spherical fuzzy numbers

Shichao Jiang, Shizhuo Zou, Jinfei Chai, Yu Zhou et al.
1 citations
Engineering Construction & Architectural Management
Geotechnical Engineering and Analysis
1.30
article

Dynamic risk assessment for subway station excavation near existing buildings using spherical fuzzy numbers

Shichao Jiang, Shizhuo Zou, Jinfei Chai, Yu Zhou, Yang Zhang, Chao Yang, Yongtao Gao
article en
1 citations

Abstract

Purpose Constructing subway stations near existing buildings is a complex engineering challenge. To identify high-risk factors and guide safe construction, a risk factor identification and safety evaluation system is needed. Design/methodology/approach Compared to intuitionistic fuzzy sets, Pythagorean fuzzy sets and similar approaches, spherical fuzzy sets provide a more nuanced representation of fuzzy information. They offer greater computational flexibility and precision in complex fuzzy decision-making scenarios. Building on this, the study constructs a full-cycle dynamic risk factor identification and safety evaluation system based on spherical fuzzy numbers, triangular fuzzy numbers and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method. The model uses expert coefficients to measure the weight of different expert judgments and the coefficient of variation to assess the consistency of expert judgments. By combining subjective expert judgments with objective on-site data, the evaluation system is built through three steps: system establishment, data processing and risk factor identification. Findings The applicability of the model was validated through the construction of the Xueshan Road Station of the Jinan Metro. An evaluation system comprising four criteria and 14 risk factors was established, covering geological conditions, construction monitoring, buildings and technical and management variables. A comprehensive evaluation of six construction stages was conducted, and the identified high-risk factors were consistent with the on-site conditions. Sensitivity analysis further verified the accuracy and stability of the model. Originality/value The model is applicable to various engineering challenges, providing a robust basis for early warning of construction risks.

Engineering Construction & Architectural Management
University of Science and Technology Beijing (CN)
Sustainable cities and communities
Openalex Percentile: Top 23%
Geotechnical Engineering and Analysis
1.30
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.