Analysis of Key Influencing Factors and Countermeasures for Integrated Cost Control of Prefabricated Buildings

This study conducted an in-depth analysis of the key influencing factors of integrated cost control for prefabricated buildings using Structural Equation Modeling (SEM) and proposed corresponding countermeasures. Firstly, through literature review and expert interviews, the main factors affecting the cost of prefabricated building integration were identified, and a cost control theoretical model was constructed, including stages such as design, production, construction, and maintenance. The SEM method was used to fit and test the model, clarifying the direct and indirect relationships between various influencing factors. The research results indicate that the design stage, production stage, construction stage, operation and maintenance stage, as well as policy and market factors, all have an impact on the cost of integrated prefabricated buildings. The importance order of its impact level is as follows: design stage > other factors > production stage > operation and maintenance stage > construction stage. The research results provide a reference for reducing costs in the integration of prefabricated buildings.

Authors

Institutions

Publication Details

Published
2025-03-26
DOI
https://doi.org/10.1061/9780784485910.151
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Key Influencing Factors and Countermeasures for Integrated Cost Control of Prefabricated Buildings

Lan Ding, Shasha Xie
BIM and Construction Integration
article

Analysis of Key Influencing Factors and Countermeasures for Integrated Cost Control of Prefabricated Buildings

Lan Ding, Shasha Xie
article en

Abstract

This study conducted an in-depth analysis of the key influencing factors of integrated cost control for prefabricated buildings using Structural Equation Modeling (SEM) and proposed corresponding countermeasures. Firstly, through literature review and expert interviews, the main factors affecting the cost of prefabricated building integration were identified, and a cost control theoretical model was constructed, including stages such as design, production, construction, and maintenance. The SEM method was used to fit and test the model, clarifying the direct and indirect relationships between various influencing factors. The research results indicate that the design stage, production stage, construction stage, operation and maintenance stage, as well as policy and market factors, all have an impact on the cost of integrated prefabricated buildings. The importance order of its impact level is as follows: design stage > other factors > production stage > operation and maintenance stage > construction stage. The research results provide a reference for reducing costs in the integration of prefabricated buildings.

Wuhan Institute of Technology (CN)
Openalex Percentile: Top 95%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Key Influencing Factors and Countermeasures for Integrated Cost Control of Prefabricated Buildings — Lan Ding, Shasha Xie · (2025) | TGRS Research Map | TGRS