Simulation-Based Modular Construction Shop Floor Design for Productivity Optimization

A lack of understanding of the construction process often results in inefficient productivity and resource waste. To address these challenges in the modular construction industry, it is crucial to analyze the production time for each task across different processes and optimize the shop floor accordingly. This paper focuses on the design and optimization of modular construction shop floors to enhance production performance. Lafaete, one of the largest modular construction companies in Brazil, is used as a case study to provide real-world insights and applicability. Three objectives, including (1) conduct an analysis of current shop floor production using the Monte Carlo simulation model, (2) achieve labor and station resource leveling through the application of queuing theory, and (3) forecast future productivity with a spreadsheet model, are achieved in this study. By implementing the proposed solution, we try to improve shop floor production efficiency and optimize the utilization of resources, ultimately contributing to the productivity advancement of the modular construction industry.

Authors

Institutions

Publication Details

Published
2025-03-26
DOI
https://doi.org/10.1061/9780784485910.040
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulation-Based Modular Construction Shop Floor Design for Productivity Optimization

Mohamed Al‐Hussein, Kunkun Li, Xue Chen, Halil Bascik et al.
BIM and Construction Integration
article

Simulation-Based Modular Construction Shop Floor Design for Productivity Optimization

Mohamed Al‐Hussein, Kunkun Li, Xue Chen, Halil Bascik, Denisse Diaz Merino, Cristhian Laura Portugal
article en

Abstract

A lack of understanding of the construction process often results in inefficient productivity and resource waste. To address these challenges in the modular construction industry, it is crucial to analyze the production time for each task across different processes and optimize the shop floor accordingly. This paper focuses on the design and optimization of modular construction shop floors to enhance production performance. Lafaete, one of the largest modular construction companies in Brazil, is used as a case study to provide real-world insights and applicability. Three objectives, including (1) conduct an analysis of current shop floor production using the Monte Carlo simulation model, (2) achieve labor and station resource leveling through the application of queuing theory, and (3) forecast future productivity with a spreadsheet model, are achieved in this study. By implementing the proposed solution, we try to improve shop floor production efficiency and optimize the utilization of resources, ultimately contributing to the productivity advancement of the modular construction industry.

University of Alberta (CA)
Decent work and economic growth
Openalex Percentile: Top 95%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.