Technical and Financial Analysis of the Integration of Electrochemical Storage Systems in the Costa Rican Power System

This paper presents a technical and financial analysis of the results pertaining Costa Rica, from a larger study for optimal capacity, allocation and use strategy, for distributed Battery Energy Storage Systems (BESS) in the Central American power grid. The study results indicate a total BESS capacity of 688 MWh / 100 MW for Costa Rica, with an estimated investment cost of approximately USD 63.29 M by 2024 and a Levelized Cost of Electricity (LCOE) of 53.04 USD/MWh. The technical feasibility of BESS implementation is established, and the financial analysis indicates that the initial installation costs do not jeopardize the project’s financial viability. The recent trend of decreasing costs has resulted in a lower Levelized Cost of Energy (LCOE) compared to that of the corresponding thermal generation unit.

Authors

Institutions

Publication Details

Published
2024-11-27
DOI
https://doi.org/10.1109/concapan63470.2024.10933877
Primary Topic
Innovation and Socioeconomic Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Technical and Financial Analysis of the Integration of Electrochemical Storage Systems in the Costa Rican Power System

Andrés Argüello, Gustavo Adolfo Gómez-Ramírez, J. Granados-Cascante
Innovation and Socioeconomic Development
article

Technical and Financial Analysis of the Integration of Electrochemical Storage Systems in the Costa Rican Power System

Andrés Argüello, Gustavo Adolfo Gómez-Ramírez, J. Granados-Cascante
article en

Abstract

This paper presents a technical and financial analysis of the results pertaining Costa Rica, from a larger study for optimal capacity, allocation and use strategy, for distributed Battery Energy Storage Systems (BESS) in the Central American power grid. The study results indicate a total BESS capacity of 688 MWh / 100 MW for Costa Rica, with an estimated investment cost of approximately USD 63.29 M by 2024 and a Levelized Cost of Electricity (LCOE) of 53.04 USD/MWh. The technical feasibility of BESS implementation is established, and the financial analysis indicates that the initial installation costs do not jeopardize the project’s financial viability. The recent trend of decreasing costs has resulted in a lower Levelized Cost of Energy (LCOE) compared to that of the corresponding thermal generation unit.

Instituto Tecnológico de Costa Rica (CR), Universidad de Costa Rica (CR)
Openalex Percentile: Top 48%
Innovation and Socioeconomic Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.