Организация труда и планирование строительного производства как факторы повышения эффективности строительства

The organization of construction production plays a key role in ensuring the uninterrupted operation of construction projects. Effective planning contributes to increased labor productivity and reduced building construction time. The article examines the main stages of the construction process, including preparatory work, structural erection, and equipment installation. Special attention is given to the flow method of work organization, which optimizes resources and improves coordination on the construction site. The use of schedule planning enables efficient management of the construction process, ensuring the timely completion of work.

Authors

Publication Details

Journal
Батыс Қазақстан инновациялық-технологиялық университетінің Хабаршысы
Published
2025-03-26
DOI
https://doi.org/10.62724/202510303
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Организация труда и планирование строительного производства как факторы повышения эффективности строительства

Зерек Мұхамбетжан, Мейрамбек Ескалиев, Мөлдір Мағауия, Мадина Санакова
Батыс Қазақстан инновациялық-технологиялық университетінің Хабаршысы
Resource-Constrained Project Scheduling
article

Организация труда и планирование строительного производства как факторы повышения эффективности строительства

Зерек Мұхамбетжан, Мейрамбек Ескалиев, Мөлдір Мағауия, Мадина Санакова
article en

Abstract

The organization of construction production plays a key role in ensuring the uninterrupted operation of construction projects. Effective planning contributes to increased labor productivity and reduced building construction time. The article examines the main stages of the construction process, including preparatory work, structural erection, and equipment installation. Special attention is given to the flow method of work organization, which optimizes resources and improves coordination on the construction site. The use of schedule planning enables efficient management of the construction process, ensuring the timely completion of work.

Батыс Қазақстан инновациялық-технологиялық университетінің ХабаршысыVol. 33(1)
Openalex Percentile: Top 94%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.