Research on Incremental Cost Management of Prefabricated Buildings Based on DEMATEL-ISM

Our country is vigorously developing prefabricated buildings, but the high cost of prefabricated buildings has been hindering its development. In order to promote prefabricated buildings, this paper analyzes the influencing factors of the incremental cost of prefabricated buildings and obtains 18 influencing factors. Through the analysis model of DEMATEL-ISM method, the hierarchical structure relationship between each factor is determined. The results show that the influencing factors are divided into five levels, with assembly capacity, relevant standards and norms, and relevant national policies as the fundamental influencing factors. The management level of construction site is the deep factor. The standardization level of component design, the standardization level of mold, and the application level of information technology are the middle-level factors. The manufacturing precision of component, the rationality of component production plan, and the scale of production of manufacturer are shallow factors. Mold turnover rate and hoisting scheme are surface factors. According to the analysis results, some suggestions on controlling the incremental cost of prefabricated buildings are put forward to provide a reference for the development of prefabricated buildings.

Authors

Institutions

Publication Details

Published
2025-03-26
DOI
https://doi.org/10.1061/9780784485910.140
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Incremental Cost Management of Prefabricated Buildings Based on DEMATEL-ISM

Jin Li, Yukun Wang, Jun Zhao
Manufacturing Process and Optimization
article

Research on Incremental Cost Management of Prefabricated Buildings Based on DEMATEL-ISM

Jin Li, Yukun Wang, Jun Zhao
article en

Abstract

Our country is vigorously developing prefabricated buildings, but the high cost of prefabricated buildings has been hindering its development. In order to promote prefabricated buildings, this paper analyzes the influencing factors of the incremental cost of prefabricated buildings and obtains 18 influencing factors. Through the analysis model of DEMATEL-ISM method, the hierarchical structure relationship between each factor is determined. The results show that the influencing factors are divided into five levels, with assembly capacity, relevant standards and norms, and relevant national policies as the fundamental influencing factors. The management level of construction site is the deep factor. The standardization level of component design, the standardization level of mold, and the application level of information technology are the middle-level factors. The manufacturing precision of component, the rationality of component production plan, and the scale of production of manufacturer are shallow factors. Mold turnover rate and hoisting scheme are surface factors. According to the analysis results, some suggestions on controlling the incremental cost of prefabricated buildings are put forward to provide a reference for the development of prefabricated buildings.

Changchun Institute of Technology (CN)
Sustainable cities and communities
Openalex Percentile: Top 93%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.