Research on the Influencing Factors of Life Cycle Cost of Urban Underground Comprehensive Pipe Gallery

With the advancement of urbanization and the growth of urban underground space utilization demand, the market of urban underground comprehensive pipe gallery is gradually expanding. The research on the influencing factors of the life cycle cost of urban underground comprehensive pipe gallery is helpful for the project subject to control the cost and optimize the project benefit. Firstly, the list of influencing factors of life cycle cost of urban underground comprehensive pipe gallery is obtained by comprehensive literature analysis and expert interview. Secondly, the DEMATEL method is used for quantitative calculation. Finally, the ISM method is used to analyze the data, clarify the factor classification and hierarchical structure, construct the multi-level hierarchical structure model of life cycle cost of urban underground comprehensive pipe gallery, and obtain the path and mechanism of cost scientific management and control. The research results provide a theoretical reference for the life cycle cost control and dynamic optimization of urban underground comprehensive pipe gallery.

Authors

Institutions

Publication Details

Published
2025-03-26
DOI
https://doi.org/10.1061/9780784485910.092
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Influencing Factors of Life Cycle Cost of Urban Underground Comprehensive Pipe Gallery

Jun Fang, Shiyang Liu
Underground infrastructure and sustainability
article

Research on the Influencing Factors of Life Cycle Cost of Urban Underground Comprehensive Pipe Gallery

Jun Fang, Shiyang Liu
article en

Abstract

With the advancement of urbanization and the growth of urban underground space utilization demand, the market of urban underground comprehensive pipe gallery is gradually expanding. The research on the influencing factors of the life cycle cost of urban underground comprehensive pipe gallery is helpful for the project subject to control the cost and optimize the project benefit. Firstly, the list of influencing factors of life cycle cost of urban underground comprehensive pipe gallery is obtained by comprehensive literature analysis and expert interview. Secondly, the DEMATEL method is used for quantitative calculation. Finally, the ISM method is used to analyze the data, clarify the factor classification and hierarchical structure, construct the multi-level hierarchical structure model of life cycle cost of urban underground comprehensive pipe gallery, and obtain the path and mechanism of cost scientific management and control. The research results provide a theoretical reference for the life cycle cost control and dynamic optimization of urban underground comprehensive pipe gallery.

Wuhan University of Technology (CN)
Openalex Percentile: Top 95%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.