Collaborative Management of Prefabricated Building Supply Chains Based on BIM-RFID

Traditional management of prefabricated construction suffers from issues, including inadequate inter-organizational communication, disconnected operating processes, and a lack of real-time project status understanding, which can adversely affect project delivery. However, the prefabricated construction management mode based on supply chain can effectively improve the synergy of all the Parties. This paper puts forward the idea of taking the construction enterprise as the leading party of the supply chain from the perspective of collaborative optimization of component procurement plan, transportation plan, and installation plan, establishes a collaborative planning model of procurement-transportation-assembly based on the goal planning theory, and constructs the framework of the plan management decision support system integrating BIM-RFID technology, which is aimed to solve the problem of the schedule delay caused by the poor collaboration in the assembly construction supply chain management. Finally, the effectiveness of this approach is validated through a typical case study, demonstrating its ability to achieve efficient collaboration among stakeholders and enhance the operational efficiency of the entire supply chain.

Authors

Institutions

Publication Details

Published
2025-03-26
DOI
https://doi.org/10.1061/9780784485910.088
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Collaborative Management of Prefabricated Building Supply Chains Based on BIM-RFID

Qing Ye, Liqiong Yang, Hang Yang
BIM and Construction Integration
article

Collaborative Management of Prefabricated Building Supply Chains Based on BIM-RFID

Qing Ye, Liqiong Yang, Hang Yang
article en

Abstract

Traditional management of prefabricated construction suffers from issues, including inadequate inter-organizational communication, disconnected operating processes, and a lack of real-time project status understanding, which can adversely affect project delivery. However, the prefabricated construction management mode based on supply chain can effectively improve the synergy of all the Parties. This paper puts forward the idea of taking the construction enterprise as the leading party of the supply chain from the perspective of collaborative optimization of component procurement plan, transportation plan, and installation plan, establishes a collaborative planning model of procurement-transportation-assembly based on the goal planning theory, and constructs the framework of the plan management decision support system integrating BIM-RFID technology, which is aimed to solve the problem of the schedule delay caused by the poor collaboration in the assembly construction supply chain management. Finally, the effectiveness of this approach is validated through a typical case study, demonstrating its ability to achieve efficient collaboration among stakeholders and enhance the operational efficiency of the entire supply chain.

Southwest University of Science and Technology (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 95%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Collaborative Management of Prefabricated Building Supply Chains Based on BIM-RFID — Qing Ye, Liqiong Yang, et al. · (2025) | TGRS Research Map | TGRS