Selecting an appropriate Project Delivery Method (PDM) is a crucial decision for owners that significantly influences the success of a construction project. Various criteria, such as the nature of construction projects and the specific characteristics of owners and projects, should be properly considered to make this decision. This paper first assesses and evaluates the key criteria for selecting a PDM for building projects in Surabaya. It then proposes a multi-criteria decision-making model for the selection of three PDMs, namely Single General Contractor, Multiple Primes, and Design and Build. A three-step questionnaire survey was conducted to achieve the objectives. The initial analysis revealed six important selection criteria, which were then modelled and used in the subsequent survey. Using the Analytical Hierarchy Process (AHP) procedures, the second analysis determined the weights of each criterion for the three PDMs. The paper discusses these weights, suggesting the relative strengths of each PDM. Finally, the paper tests the robustness of the model using three building projects in Surabaya.

Authors

Institutions

Publication Details

Journal
Civil Engineering Dimension
Published
2024-09-13
DOI
https://doi.org/10.9744/ced.26.2.111-119
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Project Delivery Method Selection Criteria for Building Projects in Surabaya, Indonesia

Andi Andi, Stephanus Eduard Sugianto, Yosep Setiadi Lukas
Civil Engineering Dimension
Construction Project Management and Performance
article

Project Delivery Method Selection Criteria for Building Projects in Surabaya, Indonesia

Andi Andi, Stephanus Eduard Sugianto, Yosep Setiadi Lukas
article en

Abstract

Selecting an appropriate Project Delivery Method (PDM) is a crucial decision for owners that significantly influences the success of a construction project. Various criteria, such as the nature of construction projects and the specific characteristics of owners and projects, should be properly considered to make this decision. This paper first assesses and evaluates the key criteria for selecting a PDM for building projects in Surabaya. It then proposes a multi-criteria decision-making model for the selection of three PDMs, namely Single General Contractor, Multiple Primes, and Design and Build. A three-step questionnaire survey was conducted to achieve the objectives. The initial analysis revealed six important selection criteria, which were then modelled and used in the subsequent survey. Using the Analytical Hierarchy Process (AHP) procedures, the second analysis determined the weights of each criterion for the three PDMs. The paper discusses these weights, suggesting the relative strengths of each PDM. Finally, the paper tests the robustness of the model using three building projects in Surabaya.

Civil Engineering DimensionVol. 26(2)
Petra Christian University (ID)
Openalex Percentile: Top 66%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.