Risk Analysis of Modest Housing Projects Scheduling using Monte Carlo Simulation

It is crucial to address uncertainties in the construction project scheduling to mitigate delays. Probabilistic simulation offers a viable alternative method. This study examined the relationship between project duration and delay risks, as well as identified the most influential activities for modest housing projects using Monte Carlo Simulation. The simulation analysis, which included 2547 iterations, found that, on average, it took 87.39 days to complete a 54-type modest house project, with the shortest and longest durations being 44 and 149 days, respectively. The sensitivity analysis revealed that finishing works, such as painting, doors/windows installation, and cleaning, had the highest uncertainty and significantly affected the project duration. Additionally, the severity analysis showed that wall work was the most impactful activity contributing to delays. Based on these analyses, both finishing works and wall work were identified as the most critical activities significantly influencing the project's completion duration.

Authors

Institutions

Publication Details

Journal
Civil Engineering Dimension
Published
2024-09-13
DOI
https://doi.org/10.9744/ced.26.2.160-172
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Analysis of Modest Housing Projects Scheduling using Monte Carlo Simulation

Arief Setiawan Budi Nugroho, Tantri Nastiti Handayani, Mochammad Fikri Nur Djohim
1 citations
Civil Engineering Dimension
BIM and Construction Integration
0.27
article

Risk Analysis of Modest Housing Projects Scheduling using Monte Carlo Simulation

Arief Setiawan Budi Nugroho, Tantri Nastiti Handayani, Mochammad Fikri Nur Djohim
article en
1 citations

Abstract

It is crucial to address uncertainties in the construction project scheduling to mitigate delays. Probabilistic simulation offers a viable alternative method. This study examined the relationship between project duration and delay risks, as well as identified the most influential activities for modest housing projects using Monte Carlo Simulation. The simulation analysis, which included 2547 iterations, found that, on average, it took 87.39 days to complete a 54-type modest house project, with the shortest and longest durations being 44 and 149 days, respectively. The sensitivity analysis revealed that finishing works, such as painting, doors/windows installation, and cleaning, had the highest uncertainty and significantly affected the project duration. Additionally, the severity analysis showed that wall work was the most impactful activity contributing to delays. Based on these analyses, both finishing works and wall work were identified as the most critical activities significantly influencing the project's completion duration.

Civil Engineering DimensionVol. 26(2)
Universitas Gadjah Mada (ID), ADA University (AZ)
Openalex Percentile: Top 39%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk Analysis of Modest Housing Projects Scheduling using Monte Carlo Simulation — Arief Setiawan Budi Nugroho, Tantri Nastiti Handayani, et al. · Civil Engineering Dimension (2024) | TGRS Research Map | TGRS