Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review

Almost all projects, whether government or private, experience change orders requested by either the contractor or the owner. In construction projects, change orders are regulated by contract provisions, which often result in project outcomes that deviate from the initial plans. This research aims to identify and analyze the factors that cause and influence Contract Change Orders (CCOs) on the cost and schedule of bore pile work for the Cisauk flyover construction project in Tangerang Regency. The study was conducted by distributing questionnaires to respondents involved in the Cisauk flyover construction project. The research employed quantitative analysis, with data from the questionnaires processed using the IBM SPSS program. The analysis methods included validity testing, reliability testing, normality testing, and factor analysis. From the study results, the ranking of each factor will be determined, and the dominant factors influencing the occurrence of Contract Change Orders (CCOs) will be identified.

Authors

Institutions

Publication Details

Journal
Engineering and Technology Journal
Published
2025-03-25
DOI
https://doi.org/10.47191/etj/v10i03.11
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review

Indra Mahendra Sukardi, Agung Wahyudi Biantoro
Engineering and Technology Journal
Construction Project Management and Performance
article

Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review

Indra Mahendra Sukardi, Agung Wahyudi Biantoro
article en

Abstract

Almost all projects, whether government or private, experience change orders requested by either the contractor or the owner. In construction projects, change orders are regulated by contract provisions, which often result in project outcomes that deviate from the initial plans. This research aims to identify and analyze the factors that cause and influence Contract Change Orders (CCOs) on the cost and schedule of bore pile work for the Cisauk flyover construction project in Tangerang Regency. The study was conducted by distributing questionnaires to respondents involved in the Cisauk flyover construction project. The research employed quantitative analysis, with data from the questionnaires processed using the IBM SPSS program. The analysis methods included validity testing, reliability testing, normality testing, and factor analysis. From the study results, the ranking of each factor will be determined, and the dominant factors influencing the occurrence of Contract Change Orders (CCOs) will be identified.

Engineering and Technology JournalVol. 10(03)
Mercu Buana University (ID)
Openalex Percentile: Top 94%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.