Leveraging The CM/GC Project Delivery Approach for Remote High Elevation Dam Rehabilitation Projects In Colorado

Colorado Parks and Wildlife (CPW) operates more dam and reservoir facilities in the State of Colorado than any other single entity and is in the process of completing rehabilitation upgrades to improve operational safety and modernization as required by the Office of the State Engineer. Many of these dam facilities have been operating 50 to 100 years in remote locations presenting challenges related to routine operations, maintenance, and completion of dam safety related repairs. Historically CPW has utilized design-bid-build procurement of construction services to complete these projects which presented additional challenges related to local contracting capabilities and undesirable contract disputes and claims. CPW recently pivoted to a CM/GC procurement process to contract for construction services for dam rehabilitation improvements where the remoteness, seasonal high-altitude limitations, complex topography, availability of local construction resources, stakeholder involvement, and other factors having an increased potential to negatively impact construction success and completion timeliness. The CM/GC delivery method has proven to be beneficial to the success of these projects by early construction contractor involvement as part of a collaborative Integrated Project Team to promote enhanced constructability solutions, innovations to improve quality and cost efficiency, risk identification and mitigation, and schedule and budget adherence. CPW has completed three projects using the CM/GC project delivery approach and select case histories (particularly the most recently completed Alberta Park Dam Rehabilitation in partnership with SEMA Construction) will be presented to demonstrate how this project delivery method overcame project site challenges and constraints to complete complex safety critical rehabilitation projects. The project scope on these projects included improving the capacity and function of service spillways, outletworks, and embankment stability and seepage features, and other dam safety infrastructure.

Authors

Publication Details

Published
2024-10-06
DOI
https://doi.org/10.37308/dfi49.2024480601
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Leveraging The CM/GC Project Delivery Approach for Remote High Elevation Dam Rehabilitation Projects In Colorado

Brian Freeland
Dam Engineering and Safety
article

Leveraging The CM/GC Project Delivery Approach for Remote High Elevation Dam Rehabilitation Projects In Colorado

Brian Freeland
article en

Abstract

Colorado Parks and Wildlife (CPW) operates more dam and reservoir facilities in the State of Colorado than any other single entity and is in the process of completing rehabilitation upgrades to improve operational safety and modernization as required by the Office of the State Engineer. Many of these dam facilities have been operating 50 to 100 years in remote locations presenting challenges related to routine operations, maintenance, and completion of dam safety related repairs. Historically CPW has utilized design-bid-build procurement of construction services to complete these projects which presented additional challenges related to local contracting capabilities and undesirable contract disputes and claims. CPW recently pivoted to a CM/GC procurement process to contract for construction services for dam rehabilitation improvements where the remoteness, seasonal high-altitude limitations, complex topography, availability of local construction resources, stakeholder involvement, and other factors having an increased potential to negatively impact construction success and completion timeliness. The CM/GC delivery method has proven to be beneficial to the success of these projects by early construction contractor involvement as part of a collaborative Integrated Project Team to promote enhanced constructability solutions, innovations to improve quality and cost efficiency, risk identification and mitigation, and schedule and budget adherence. CPW has completed three projects using the CM/GC project delivery approach and select case histories (particularly the most recently completed Alberta Park Dam Rehabilitation in partnership with SEMA Construction) will be presented to demonstrate how this project delivery method overcame project site challenges and constraints to complete complex safety critical rehabilitation projects. The project scope on these projects included improving the capacity and function of service spillways, outletworks, and embankment stability and seepage features, and other dam safety infrastructure.

Openalex Percentile: Top 68%
Dam Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.