Development of a Quantitative Assessment Algorithm for Operational Risks in Mining Engineering

Whenever any type of ore deposit is developed, it comes with significant risks, such as uncertain reserves, harsh climate conditions, and other uncontrollable factors. To manage these risks effectively, companies need to quickly adapt to changing conditions. This paper presents a method for evaluating risks using a simulation model. The main objective is to identify factors of operational risk and determine the project parameters that have the greatest impact on the probability of a risk event. The method includes the classification of operational risks based on the way they arise; the creation of a risk decomposition matrix dividing risks by production tasks; and the construction of a mathematical model using the identified risk factors. The method was tested by developing a simulation model of an underground mine conveyor network in Anylogic (8.9.2) software. A simulation experiment showed that conveyor shutdowns could result in an 11.23% reduction in annual revenue. Based on the results, recommendations were made on how these risks can be reduced and on the need to implement a transport system to increase resilience.

Authors

Institutions

Publication Details

Journal
Resources
Published
2025-03-25
DOI
https://doi.org/10.3390/resources14040053
Citations
2
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
2.43
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of a Quantitative Assessment Algorithm for Operational Risks in Mining Engineering

Marina Nevskaya, Liubov Nikolaichuk, Anna Shabalova, Natalya Kirsanova
2 citations
Resources
Mining Techniques and Economics
2.43
article

Development of a Quantitative Assessment Algorithm for Operational Risks in Mining Engineering

Marina Nevskaya, Liubov Nikolaichuk, Anna Shabalova, Natalya Kirsanova
article en
2 citations

Abstract

Whenever any type of ore deposit is developed, it comes with significant risks, such as uncertain reserves, harsh climate conditions, and other uncontrollable factors. To manage these risks effectively, companies need to quickly adapt to changing conditions. This paper presents a method for evaluating risks using a simulation model. The main objective is to identify factors of operational risk and determine the project parameters that have the greatest impact on the probability of a risk event. The method includes the classification of operational risks based on the way they arise; the creation of a risk decomposition matrix dividing risks by production tasks; and the construction of a mathematical model using the identified risk factors. The method was tested by developing a simulation model of an underground mine conveyor network in Anylogic (8.9.2) software. A simulation experiment showed that conveyor shutdowns could result in an 11.23% reduction in annual revenue. Based on the results, recommendations were made on how these risks can be reduced and on the need to implement a transport system to increase resilience.

ResourcesVol. 14(4)
Saint Petersburg Mining University (RU)
Openalex Percentile: Top 13%
Mining Techniques and Economics
2.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.