Special Construction and Geotechnical Considerations in Deep Foundation of Vaudreuil-Soulanges Hospital Center in Greater Montreal Area
Vaudreuil-Soulanges Hospital Center in Greater Montreal area is a substantially large construction project with challenging schedule and geological conditions. The foundation consisted of 519 piles with an average overburden of 15 m and 4.5 rock sockets that were constructed in a tight schedule of 9 months. Special Geotechnical considerations were required and adopted for design and construction of this large-scale foundation. In this Design and Build contract, the strong cooperation between the designer and the contractor resulted in a substantial optimization of the quantities through in-situ full-scale vertical static and lateral cyclic pile-load tests, seismic simulations in design of the piles, and orienting the design to fit the planned drilling method. To maintain a challenging schedule in a cost-effective manner, seven drilling rigs fitted with temporary casings were used, operating in two shifts up to seven days a week. For drilling of the piles, cluster drilling was used by contractor due to uncommon abrasiveness and high strength (> 200 MPa) of the encountered sandstone bedrock. To further assist the construction of the piles, a new concrete mix was developed specifically for this project for the purpose of tremie pours. The concrete mix design is based on optimizing its rheology, maintaining its workability up to 6 hours and its durability more than 75 years design life in a particularly aggressive environment in chloride, sulfate, and others aggressive ions. An effective quality control and assurance program made it possible to find optimal solutions during construction.
Authors
- Mathieu CATONNE
Publication Details
- Published
- 2024-10-06
- DOI
- https://doi.org/10.37308/dfi49.2024140310
- Primary Topic
- Grouting, Rheology, and Soil Mechanics
- Type
- article
- Field-Weighted Citation Impact
- 0.00