MnDOT's I35W Stormwater Storage Facility - Flooding Resolution in Challenging Ground using a Series of Six Diaphragm Wall Cells

During the past several decades, a segment of Interstate 35W (I-35W) at 42nd Street, located in Minneapolis, Minnesota, has experienced flooding during intense storm events. Flooding is caused by a combination of runoff from the upstream watershed and backflow through the downstream stormwater tunnel system. The Minnesota Department of Transportation (MnDOT) evaluated several stormwater storage facility (SSF) concepts to mitigate flooding. The sub-grade storage tanks are located adjacent to I-35 WB, between the highway shoulder and 2nd Avenue, which is elevated approximately 25’ above the highway. Prior to construction, there was an embankment covering the footprint of the new storage tanks, which supported earth loads and provided base reactions for a soundwall running parallel to 2nd Avenue. Therefore, an earth retention system would need to be installed to permit removal of the embankment. The project team elected to build a soil nail wall, which was constructed in lifts as the embankment removal progressed. Notable challenges related to design and construction of the soil nail wall were as follows: (1) elevations and angles of the soil nails to avoid conflict with existing utilities on the backside of the wall, and (2) sound wall base reactions including separate load cases for wind load acting in each direction to determine the governing scenario for the retaining wall. Design and construction consisted of six underground storage cells approximately 80 feet deep and 42 feet in diameter. The cells were constructed using slurry diaphragm walls and depressurization which allows for handling a high groundwater table (approximately 10-15 feet below highway grade) and highly variable glacial outwash soils in a congested construction area. This paper will discuss the design and construction considerations for the soil nail wall and underground storage tanks.

Authors

Publication Details

Published
2024-10-06
DOI
https://doi.org/10.37308/dfi49.2024640705
Primary Topic
Water Systems and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

MnDOT's I35W Stormwater Storage Facility - Flooding Resolution in Challenging Ground using a Series of Six Diaphragm Wall Cells

Gregory Spicer
Water Systems and Optimization
article

MnDOT's I35W Stormwater Storage Facility - Flooding Resolution in Challenging Ground using a Series of Six Diaphragm Wall Cells

Gregory Spicer
article en

Abstract

During the past several decades, a segment of Interstate 35W (I-35W) at 42nd Street, located in Minneapolis, Minnesota, has experienced flooding during intense storm events. Flooding is caused by a combination of runoff from the upstream watershed and backflow through the downstream stormwater tunnel system. The Minnesota Department of Transportation (MnDOT) evaluated several stormwater storage facility (SSF) concepts to mitigate flooding. The sub-grade storage tanks are located adjacent to I-35 WB, between the highway shoulder and 2nd Avenue, which is elevated approximately 25’ above the highway. Prior to construction, there was an embankment covering the footprint of the new storage tanks, which supported earth loads and provided base reactions for a soundwall running parallel to 2nd Avenue. Therefore, an earth retention system would need to be installed to permit removal of the embankment. The project team elected to build a soil nail wall, which was constructed in lifts as the embankment removal progressed. Notable challenges related to design and construction of the soil nail wall were as follows: (1) elevations and angles of the soil nails to avoid conflict with existing utilities on the backside of the wall, and (2) sound wall base reactions including separate load cases for wind load acting in each direction to determine the governing scenario for the retaining wall. Design and construction consisted of six underground storage cells approximately 80 feet deep and 42 feet in diameter. The cells were constructed using slurry diaphragm walls and depressurization which allows for handling a high groundwater table (approximately 10-15 feet below highway grade) and highly variable glacial outwash soils in a congested construction area. This paper will discuss the design and construction considerations for the soil nail wall and underground storage tanks.

Openalex Percentile: Top 68%
Water Systems and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.