A unique application of Diaphragm Wall to facilitate the excavation of New River Channel on The Port Lands Flood Protection and Enabling Infrastructure Project in Toronto, Ontario

The Port Lands in Downtown Toronto is a vast waterfront area that has been long remained undeveloped. This is due to the dual challenges of soil contamination resulting from decades of industrial activities and high flooding potential from the nearby Don River. The Port Lands Flood Protection and Enabling Infrastructure Project (PLFP) seeks to unlock the development potential of this strategic downtown land. This initiative also simultaneously mitigating flood risks for the Port Lands and surrounding areas. The project involves the creation of a new river channel through the existing Port Lands to redirect floodwaters into the inner harbor and Lake Ontario. This new river channel excavation is protected by three dam liked plug walls which isolate the lake water from entering the excavation. Given the industrial contamination in the soil, the installation of a permanent cut-off wall along the new river alignment is also imperative to isolate contaminants from migrating into the future river channel. The west plug wall is positioned at the westernmost point of the river channel excavation and directly adjacent to Lake Ontario. The innovative use of a diaphragm wall technique to construct the west plug wall allow the wall to serve as a dock wall, dam, excavation support, cut-off wall, and load-bearing element throughout the different stages of the river excavation. This paper provides a comprehensive overview of the design and installation of the west plug wall. It provides valuable insights into the practical application of diaphragm walls and how it helps deliver this complex urban flood protection and infrastructure projects.

Authors

Publication Details

Published
2024-10-06
DOI
https://doi.org/10.37308/dfi49.20241090704
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A unique application of Diaphragm Wall to facilitate the excavation of New River Channel on The Port Lands Flood Protection and Enabling Infrastructure Project in Toronto, Ontario

H. Lee
Geotechnical Engineering and Analysis
article

A unique application of Diaphragm Wall to facilitate the excavation of New River Channel on The Port Lands Flood Protection and Enabling Infrastructure Project in Toronto, Ontario

H. Lee
article en

Abstract

The Port Lands in Downtown Toronto is a vast waterfront area that has been long remained undeveloped. This is due to the dual challenges of soil contamination resulting from decades of industrial activities and high flooding potential from the nearby Don River. The Port Lands Flood Protection and Enabling Infrastructure Project (PLFP) seeks to unlock the development potential of this strategic downtown land. This initiative also simultaneously mitigating flood risks for the Port Lands and surrounding areas. The project involves the creation of a new river channel through the existing Port Lands to redirect floodwaters into the inner harbor and Lake Ontario. This new river channel excavation is protected by three dam liked plug walls which isolate the lake water from entering the excavation. Given the industrial contamination in the soil, the installation of a permanent cut-off wall along the new river alignment is also imperative to isolate contaminants from migrating into the future river channel. The west plug wall is positioned at the westernmost point of the river channel excavation and directly adjacent to Lake Ontario. The innovative use of a diaphragm wall technique to construct the west plug wall allow the wall to serve as a dock wall, dam, excavation support, cut-off wall, and load-bearing element throughout the different stages of the river excavation. This paper provides a comprehensive overview of the design and installation of the west plug wall. It provides valuable insights into the practical application of diaphragm walls and how it helps deliver this complex urban flood protection and infrastructure projects.

Openalex Percentile: Top 65%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A unique application of Diaphragm Wall to facilitate the excavation of New River Channel on The Port Lands Flood Protection and Enabling Infrastructure Project in Toronto, Ontario — H. Lee · (2024) | TGRS Research Map | TGRS