Evaluating complexity of construction precast component: empirical study in Taiwan

Companies in the construction precast industry usually face lack of skilled manpower, overtime working, and complexity of manpower allocation. The objective of this research is to identify the complexity of precast components using Swarm-Inspired Projection (SIP) algorithm. After conducting a comprehensive literature review regarding precast production, clustering, classification, cost management, manpower allocation, and optimization, expertise from field/head-quarter supervision leads the way to SIP algorithm that drives collected data converted to certain clusters. Data collection was carried out to gather over 90% precast construction data in Taiwan for the recent decade. A total of 1,015,840 datasets were collected and then 772,212 datasets were taken into computation SIP algorithm after data filtering. Evaluation and comparison of models reveal SIP’s remarkable efficiency, halving processing time while delivering superior results. The study identifies four complexity tiers linked to the manufacturing of building precast elements. Significant variations exist among these tiers, with workload increments of 18.22%, 11.71%, and 30.08% between Level 1 and 2, Level 2 and 3, and Level 3 and 4, respectively.

Authors

Institutions

Publication Details

Journal
Journal of Civil Engineering and Management
Published
2025-03-20
DOI
https://doi.org/10.3846/jcem.2025.23323
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating complexity of construction precast component: empirical study in Taiwan

Jieh‐Haur Chen, Shu‐Chien Hsu, Mu‐Chun Su, Hsing-Wei Tai et al.
1 citations
Journal of Civil Engineering and Management
Construction Project Management and Performance
2.11
article

Evaluating complexity of construction precast component: empirical study in Taiwan

Jieh‐Haur Chen, Shu‐Chien Hsu, Mu‐Chun Su, Hsing-Wei Tai, Sheng-Kuo Lin
article en
1 citations

Abstract

Companies in the construction precast industry usually face lack of skilled manpower, overtime working, and complexity of manpower allocation. The objective of this research is to identify the complexity of precast components using Swarm-Inspired Projection (SIP) algorithm. After conducting a comprehensive literature review regarding precast production, clustering, classification, cost management, manpower allocation, and optimization, expertise from field/head-quarter supervision leads the way to SIP algorithm that drives collected data converted to certain clusters. Data collection was carried out to gather over 90% precast construction data in Taiwan for the recent decade. A total of 1,015,840 datasets were collected and then 772,212 datasets were taken into computation SIP algorithm after data filtering. Evaluation and comparison of models reveal SIP’s remarkable efficiency, halving processing time while delivering superior results. The study identifies four complexity tiers linked to the manufacturing of building precast elements. Significant variations exist among these tiers, with workload increments of 18.22%, 11.71%, and 30.08% between Level 1 and 2, Level 2 and 3, and Level 3 and 4, respectively.

Journal of Civil Engineering and ManagementVol. 31(3)
Shandong University of Technology (CN), Hong Kong Polytechnic University (HK), National Central University (TW)
National Science and Technology Council
Openalex Percentile: Top 15%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluating complexity of construction precast component: empirical study in Taiwan — Jieh‐Haur Chen, Shu‐Chien Hsu, et al. · Journal of Civil Engineering and Management (2025) | TGRS Research Map | TGRS