High RF voltage resonator test facility for new ASDEX Upgrade ICRF antenna vacuum feedthrough

New vacuum feedthrough has been recently designed for the ASDEX Upgrade ICRF system. Vacuum feedthroughs in general can limit the voltage standoff of high power RF systems. ICRF vacuum feedthroughs are no exception, they require careful design, as well as qualifications and testing prior to installation to the antenna. The paper shows the design of a new full wavelength resonator test facility for the new ASDEX Upgrade ICRF antenna vacuum feedthroughs. The new test facility is an extension to ISHTAR (Ion-cyclotron System Hardware Test Arrangement) and is designed to have two configurations: the first one with two new 9-inch windows with improved surrounding structures (corona rings or arc traps); the second one with a 6-inch window with old-existing surrounding structures and one new 9-inch window. A set of high power tests (∼400 kW, ≤10 s) are planned using ASDEX Upgrade ICRF generator 5 in order to achieve the same voltage stand-off as it is during the ICRF system operation on ASDEX Upgrade. Different ceramics are characterized and considered for ASDEX Upgrade RF windows.

Authors

Institutions

Publication Details

Journal
Fusion Engineering and Design
Published
2025-03-24
DOI
https://doi.org/10.1016/j.fusengdes.2025.114984
Citations
1
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
4.99

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

High RF voltage resonator test facility for new ASDEX Upgrade ICRF antenna vacuum feedthrough

H. Faugel, O. Girka, W. Helou, V. Bobkov et al.
1 citations
Fusion Engineering and Design
Particle accelerators and beam dynamics
4.99
article

High RF voltage resonator test facility for new ASDEX Upgrade ICRF antenna vacuum feedthrough

H. Faugel, O. Girka, W. Helou, V. Bobkov, H. Fünfgelder
article en
1 citations

Abstract

New vacuum feedthrough has been recently designed for the ASDEX Upgrade ICRF system. Vacuum feedthroughs in general can limit the voltage standoff of high power RF systems. ICRF vacuum feedthroughs are no exception, they require careful design, as well as qualifications and testing prior to installation to the antenna. The paper shows the design of a new full wavelength resonator test facility for the new ASDEX Upgrade ICRF antenna vacuum feedthroughs. The new test facility is an extension to ISHTAR (Ion-cyclotron System Hardware Test Arrangement) and is designed to have two configurations: the first one with two new 9-inch windows with improved surrounding structures (corona rings or arc traps); the second one with a 6-inch window with old-existing surrounding structures and one new 9-inch window. A set of high power tests (∼400 kW, ≤10 s) are planned using ASDEX Upgrade ICRF generator 5 in order to achieve the same voltage stand-off as it is during the ICRF system operation on ASDEX Upgrade. Different ceramics are characterized and considered for ASDEX Upgrade RF windows.

Fusion Engineering and DesignVol. 215
ITER (FR), Max Planck Institute for Plasma Physics (DE)
EUROfusion, European Commission
Affordable and clean energy
Openalex Percentile: Top 7%
Particle accelerators and beam dynamics
4.99
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.