Schedule Optimization for New Power Base Considering the Reliability of Outgoing Transmission

The power outgoing of new energy base is characterized by strong randomness and volatility. The cross-region outgoing transmission characteristics change greatly compared with the traditional alternating current (AC) transmission, which increases the difficulty of grid's safe functioning. It is urgent to study the direct current (DC) outgoing curve planning method considering the joint output of different energy sources. Under this background, aiming at new energy base in desert areas, this paper studies the multi-energy complementary cooperative optimal scheduling of wind-photovoltaic-thermal-pumped storage cogeneration systems. An optimal dispatch model is developed considering the reliability of outgoing output of new energy base. The model takes maximizing renewable energy output as the objective function. Operational constraints of new energy, thermal power, and pumped storage are involved and constraints to ensure the reliability of the base's outgoing transmission are considered. Then, Yalmip optimization toolbox is employed to solve this model. Finally, model's outcomes are assessed using existing data.

Authors

Institutions

Publication Details

Published
2024-10-25
DOI
https://doi.org/10.1109/appeec61255.2024.10922633
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Schedule Optimization for New Power Base Considering the Reliability of Outgoing Transmission

Yi Zhang, Feng Wu, Shwu‐Fan Ma, Yang Li et al.
1 links
Power Systems and Technologies
article

Schedule Optimization for New Power Base Considering the Reliability of Outgoing Transmission

Yi Zhang, Feng Wu, Shwu‐Fan Ma, Yang Li, Xudong Song, Mengjun Wang
article en

Abstract

The power outgoing of new energy base is characterized by strong randomness and volatility. The cross-region outgoing transmission characteristics change greatly compared with the traditional alternating current (AC) transmission, which increases the difficulty of grid's safe functioning. It is urgent to study the direct current (DC) outgoing curve planning method considering the joint output of different energy sources. Under this background, aiming at new energy base in desert areas, this paper studies the multi-energy complementary cooperative optimal scheduling of wind-photovoltaic-thermal-pumped storage cogeneration systems. An optimal dispatch model is developed considering the reliability of outgoing output of new energy base. The model takes maximizing renewable energy output as the objective function. Operational constraints of new energy, thermal power, and pumped storage are involved and constraints to ensure the reliability of the base's outgoing transmission are considered. Then, Yalmip optimization toolbox is employed to solve this model. Finally, model's outcomes are assessed using existing data.

Hohai University (CN), Beijing Solar Energy Research Institute (CN)
Affordable and clean energy
Openalex Percentile: Top 73%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Schedule Optimization for New Power Base Considering the Reliability of Outgoing Transmission — Yi Zhang, Feng Wu, et al. · (2024) | TGRS Research Map | TGRS