Optimized Deloading Operation of Wind Turbine Generator in Virtual Power Plant Considering Forecast Error and Carbon Trading

For virtual power plant (VPP) that includes the wind turbine generator (WTG) and gas turbine (GT), output power curve of the VPP to participate in the bidding of day-ahead electricity market is determined with the wind speed forecast. The forecast error of the wind speed may result in inadequate power output from the WTG and the deficiency may be compensated by power output from the GT. The deficiency may be reduced by bidding with the power output curve of the WTG under the deloading operation mode. In this article, the overall operation cost of the VPP with the deloading operation of the WTG is evaluated, which considers revenue from the electricity sale, as well as cost of GT operation, carbon trading, and active power reserve. The deloading ratio of the WTG is optimized by evaluating the operation cost, in order to minimize the impact of the forecast error on the overall operation cost of the VPP. Numerical analysis result validates the effectiveness of the proposed optimization algorithm.

Authors

Institutions

Publication Details

Published
2024-10-25
DOI
https://doi.org/10.1109/appeec61255.2024.10922564
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimized Deloading Operation of Wind Turbine Generator in Virtual Power Plant Considering Forecast Error and Carbon Trading

Dongsen Li, Jiejie Huang, Yang Yan, Yiyue Xu et al.
Power Systems and Renewable Energy
article

Optimized Deloading Operation of Wind Turbine Generator in Virtual Power Plant Considering Forecast Error and Carbon Trading

Dongsen Li, Jiejie Huang, Yang Yan, Yiyue Xu, Kang Qian, Zhangfan Wang
article en

Abstract

For virtual power plant (VPP) that includes the wind turbine generator (WTG) and gas turbine (GT), output power curve of the VPP to participate in the bidding of day-ahead electricity market is determined with the wind speed forecast. The forecast error of the wind speed may result in inadequate power output from the WTG and the deficiency may be compensated by power output from the GT. The deficiency may be reduced by bidding with the power output curve of the WTG under the deloading operation mode. In this article, the overall operation cost of the VPP with the deloading operation of the WTG is evaluated, which considers revenue from the electricity sale, as well as cost of GT operation, carbon trading, and active power reserve. The deloading ratio of the WTG is optimized by evaluating the operation cost, in order to minimize the impact of the forecast error on the overall operation cost of the VPP. Numerical analysis result validates the effectiveness of the proposed optimization algorithm.

Nantong University (CN), China Design Group (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 66%
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.