Interactive Scheduling of Virtual Power Plants and Distribution Grids Considering Uncertainty Constraints

With the continuous improvement of new energy utilization technology, the interactive integration of new energy generation and distribution networks has become an important research direction, and virtual power plants are one of the critical research contents. The uncertainty of power-side generation in virtual power plants often brings risk to the virtual power plant's participation in distribution grid scheduling. In this paper, the economic models of the internal components of the virtual power plant - power-side micro-units, storage resources, and load resources - are constructed, respectively. The total generation cost is proposed as the objective function for its participation in distribution grid scheduling. At the same time, considering the uncertainty constraints, the conditional risk value is added to the objective function as a risk metric, which provides a reference for the virtual power plant operators and realizes the optimal allocation of resources. The effectiveness of the model is finally verified through simulation experiments.

Authors

Institutions

Publication Details

Published
2024-10-25
DOI
https://doi.org/10.1109/appeec61255.2024.10922490
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Interactive Scheduling of Virtual Power Plants and Distribution Grids Considering Uncertainty Constraints

Da Xu, Xuequan Xiao, Xueyan He, Yingjun Wu et al.
1 links
Scheduling and Optimization Algorithms
article

Interactive Scheduling of Virtual Power Plants and Distribution Grids Considering Uncertainty Constraints

Da Xu, Xuequan Xiao, Xueyan He, Yingjun Wu, Teng Song, Xiao Zhang
article en

Abstract

With the continuous improvement of new energy utilization technology, the interactive integration of new energy generation and distribution networks has become an important research direction, and virtual power plants are one of the critical research contents. The uncertainty of power-side generation in virtual power plants often brings risk to the virtual power plant's participation in distribution grid scheduling. In this paper, the economic models of the internal components of the virtual power plant - power-side micro-units, storage resources, and load resources - are constructed, respectively. The total generation cost is proposed as the objective function for its participation in distribution grid scheduling. At the same time, considering the uncertainty constraints, the conditional risk value is added to the objective function as a risk metric, which provides a reference for the virtual power plant operators and realizes the optimal allocation of resources. The effectiveness of the model is finally verified through simulation experiments.

Hohai University (CN)
State Grid Corporation of China
Affordable and clean energy
Openalex Percentile: Top 58%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Interactive Scheduling of Virtual Power Plants and Distribution Grids Considering Uncertainty Constraints — Da Xu, Xuequan Xiao, et al. · (2024) | TGRS Research Map | TGRS