The paper carried out a stability assessment to determine whether or not synchronism will be maintained after a disturbance. The paper also determines the critical clearing time it will take before synchronism will be reached. In order to achieve this aim, the Benin-IkejaWest-Aiyede-Oshogbo-Benin (BIAOB) network cluster was used. The Equal Area Criterion (EAC) algorithms with EAC power and faults were simulated on the MATLAB 2015a m.file command window. In order to maintain stability, the initial power angle for each machine was set to zero. The simulated results show that critical clearing time when faults take place on each power plant at which A1=A2 for Egbin, Sapele, Papalanto and Omotosho power plants were presented 0.097sec,0.105sec,0.0662sec and 0.065sec respectively. Further results show that Ikeja west-Aiyede and Oshogbo-Benin buses are more stable in ring circuit and also confirm Benin as a critical bus closely followed by Oshogbo bus in Nigerian power transmission network. Additional results show a transfer reactance of 0.65pu for Sapele power plant leading to highest critical time of 0.11s. The significance of the study therefore is to determine stability of the network.

Authors

Institutions

Publication Details

Published
2024-11-26
DOI
https://doi.org/10.1109/nigercon62786.2024.10927266
Primary Topic
Power System Optimization and Stability
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating the Transient Stability of an Island Grid Network

Abel E. Airoboman, Jesse Tanko Zarmai, Ibrahim Abdulmumin
Power System Optimization and Stability
article

Evaluating the Transient Stability of an Island Grid Network

Abel E. Airoboman, Jesse Tanko Zarmai, Ibrahim Abdulmumin
article en

Abstract

The paper carried out a stability assessment to determine whether or not synchronism will be maintained after a disturbance. The paper also determines the critical clearing time it will take before synchronism will be reached. In order to achieve this aim, the Benin-IkejaWest-Aiyede-Oshogbo-Benin (BIAOB) network cluster was used. The Equal Area Criterion (EAC) algorithms with EAC power and faults were simulated on the MATLAB 2015a m.file command window. In order to maintain stability, the initial power angle for each machine was set to zero. The simulated results show that critical clearing time when faults take place on each power plant at which A1=A2 for Egbin, Sapele, Papalanto and Omotosho power plants were presented 0.097sec,0.105sec,0.0662sec and 0.065sec respectively. Further results show that Ikeja west-Aiyede and Oshogbo-Benin buses are more stable in ring circuit and also confirm Benin as a critical bus closely followed by Oshogbo bus in Nigerian power transmission network. Additional results show a transfer reactance of 0.65pu for Sapele power plant leading to highest critical time of 0.11s. The significance of the study therefore is to determine stability of the network.

University of North Carolina at Charlotte (US), Nigerian Defence Academy (NG)
Tertiary Education Trust Fund
Climate action
Openalex Percentile: Top 74%
Power System Optimization and Stability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.