Proposed Methodology for the Feasibility Study of Hydroelectricity Generation at Gwaigwaye Reservoir in Funtua, Katsina State

Access to electricity in Sub-Saharan Africa is very poor and has impeded socioeconomic development and growth of African nations and communities. Gwaigwaye Water Reservoir is one of the two water sources in Funtua mainly used for irrigation and potable water supply. This study examines the feasibility of establishing a hydroelectricity generation plant using the Gwaigwaye water reservoir scheme as an effort to increase access to electricity in the Funtua town and environs, thereby alleviating power poverty and improving the standard of living in the area. The research seeks answers to design questions such as the capacity of Gwaigwaye Reservoir, the optimum intake location, the obtainable head, the discharge rate, and the generation potential for the proposed hydroelectricity project. Being a proposal, only basic and theoretical facts were collected, analyzed, and presented in this work. Topographical data obtained with the use of Google Earth tool was extrapolated to determine the reservoir surface area. Initial design data of the dam and data obtained during preliminary site visits were used. Hypothetical results obtained showed Gwaigwaye Reservoir has the potential to produce about 2 MW of electricity. This would be tested against applicable site conditions to determine optimum results and layout.

Authors

Institutions

Publication Details

Published
2024-11-26
DOI
https://doi.org/10.1109/nigercon62786.2024.10927097
Primary Topic
Hydropower, Displacement, Environmental Impact
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Proposed Methodology for the Feasibility Study of Hydroelectricity Generation at Gwaigwaye Reservoir in Funtua, Katsina State

Muhammad Abdullahi, Patrick O. Olabisi
Hydropower, Displacement, Environmental Impact
article

Proposed Methodology for the Feasibility Study of Hydroelectricity Generation at Gwaigwaye Reservoir in Funtua, Katsina State

Muhammad Abdullahi, Patrick O. Olabisi
article en

Abstract

Access to electricity in Sub-Saharan Africa is very poor and has impeded socioeconomic development and growth of African nations and communities. Gwaigwaye Water Reservoir is one of the two water sources in Funtua mainly used for irrigation and potable water supply. This study examines the feasibility of establishing a hydroelectricity generation plant using the Gwaigwaye water reservoir scheme as an effort to increase access to electricity in the Funtua town and environs, thereby alleviating power poverty and improving the standard of living in the area. The research seeks answers to design questions such as the capacity of Gwaigwaye Reservoir, the optimum intake location, the obtainable head, the discharge rate, and the generation potential for the proposed hydroelectricity project. Being a proposal, only basic and theoretical facts were collected, analyzed, and presented in this work. Topographical data obtained with the use of Google Earth tool was extrapolated to determine the reservoir surface area. Initial design data of the dam and data obtained during preliminary site visits were used. Hypothetical results obtained showed Gwaigwaye Reservoir has the potential to produce about 2 MW of electricity. This would be tested against applicable site conditions to determine optimum results and layout.

Bells University of Technology (NG)
Openalex Percentile: Top 54%
Hydropower, Displacement, Environmental Impact
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Proposed Methodology for the Feasibility Study of Hydroelectricity Generation at Gwaigwaye Reservoir in Funtua, Katsina State — Muhammad Abdullahi, Patrick O. Olabisi · (2024) | TGRS Research Map | TGRS