An Effective CDS Heuristic for the Fuzzy Flow Shop Scheduling Problem With Ordered Precedence Constraints Using Pentagonal Fuzzy Processing Time

In today’s modern manufacturing environment, effective production scheduling has a major impact on constructing schedules that meet customer demands efficiently, with uncertainties in production processes, such as variable job processing times and dynamic demand. This study presents an effective CDS heuristic for the n-job m-machine flow shop scheduling problem with ordered precedence constraints and fuzzy logic, aimed at determining a sequence that minimizes the fuzzy makespan. Job processing times are represented using pentagonal fuzzy numbers, and a new robust ranking method is employed for the defuzzification process. A key contribution of this research is the integration of these two methods to address the scheduling problem. Extensive numerical tests were conducted to validate the effectiveness of the proposed model. The results showed that the fuzzy makespan achieved its minimum value when ordered precedence constraints were applied. Additionally, the paper assesses the performance of these methods in terms of solution quality, utilizing test problems ranging from 10 to 40 jobs across various machines. The findings indicate that the proposed methods consistently yield better results.

Authors

Institutions

Publication Details

Journal
IEEE Access
Published
2025-01-01
DOI
https://doi.org/10.1109/access.2025.3554021
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Effective CDS Heuristic for the Fuzzy Flow Shop Scheduling Problem With Ordered Precedence Constraints Using Pentagonal Fuzzy Processing Time

K. Karthikeyan, K. Ranjith
IEEE Access
Scheduling and Optimization Algorithms
article

An Effective CDS Heuristic for the Fuzzy Flow Shop Scheduling Problem With Ordered Precedence Constraints Using Pentagonal Fuzzy Processing Time

K. Karthikeyan, K. Ranjith
article en

Abstract

In today’s modern manufacturing environment, effective production scheduling has a major impact on constructing schedules that meet customer demands efficiently, with uncertainties in production processes, such as variable job processing times and dynamic demand. This study presents an effective CDS heuristic for the n-job m-machine flow shop scheduling problem with ordered precedence constraints and fuzzy logic, aimed at determining a sequence that minimizes the fuzzy makespan. Job processing times are represented using pentagonal fuzzy numbers, and a new robust ranking method is employed for the defuzzification process. A key contribution of this research is the integration of these two methods to address the scheduling problem. Extensive numerical tests were conducted to validate the effectiveness of the proposed model. The results showed that the fuzzy makespan achieved its minimum value when ordered precedence constraints were applied. Additionally, the paper assesses the performance of these methods in terms of solution quality, utilizing test problems ranging from 10 to 40 jobs across various machines. The findings indicate that the proposed methods consistently yield better results.

IEEE AccessVol. 13
Vellore Institute of Technology University (IN)
Openalex Percentile: Top 93%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics