Triple-Layer Genetic Algorithm (3LGA) for Project Scheduling and Material Ordering Problem with Limited Storage Space

Efficient project management in the construction industry depends on optimizing project scheduling and material ordering, two interdependent processes that significantly impact both costs and durations. Traditional approaches often address these processes separately, neglecting the trade-offs between scheduling costs and material procurement costs. Furthermore, existing studies frequently overlook real-world constraints, such as limited storage space at construction sites. To bridge these gaps, this paper investigates the project scheduling and material ordering problem with limited storage space (PSMOP-LSS) and introduces an integrated model that simultaneously optimizes storage space allocation, activity scheduling, and material ordering. A novel ordering strategy with time period (OSTP) is employed to enhance material procurement under storage constraints. To solve this NP-hard problem, a triple-layer genetic algorithm (3LGA) is proposed, comprising three layers: space allocation, project scheduling, and material ordering. Computational experiments conducted on a case study demonstrate the effectiveness of the 3LGA, achieving significant reductions in project costs and durations compared to conventional ordering strategies. The results highlight trade-offs between cost and duration, offering actionable insights for project managers. This research provides a robust decision-making framework for balancing inventory costs, ordering costs, and project durations in space-constrained environments. Managerial implications include optimizing ordering strategies based on storage capacity and cost parameters.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-03-24
DOI
https://doi.org/10.3390/buildings15071040
Citations
3
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
3.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Triple-Layer Genetic Algorithm (3LGA) for Project Scheduling and Material Ordering Problem with Limited Storage Space

Narongrit Wongwai, Suphawut Malaikrisanachalee, Pongpan Promchun
3 citations
Buildings
Advanced Manufacturing and Logistics Optimization
3.73
article

Triple-Layer Genetic Algorithm (3LGA) for Project Scheduling and Material Ordering Problem with Limited Storage Space

Narongrit Wongwai, Suphawut Malaikrisanachalee, Pongpan Promchun
article en
3 citations

Abstract

Efficient project management in the construction industry depends on optimizing project scheduling and material ordering, two interdependent processes that significantly impact both costs and durations. Traditional approaches often address these processes separately, neglecting the trade-offs between scheduling costs and material procurement costs. Furthermore, existing studies frequently overlook real-world constraints, such as limited storage space at construction sites. To bridge these gaps, this paper investigates the project scheduling and material ordering problem with limited storage space (PSMOP-LSS) and introduces an integrated model that simultaneously optimizes storage space allocation, activity scheduling, and material ordering. A novel ordering strategy with time period (OSTP) is employed to enhance material procurement under storage constraints. To solve this NP-hard problem, a triple-layer genetic algorithm (3LGA) is proposed, comprising three layers: space allocation, project scheduling, and material ordering. Computational experiments conducted on a case study demonstrate the effectiveness of the 3LGA, achieving significant reductions in project costs and durations compared to conventional ordering strategies. The results highlight trade-offs between cost and duration, offering actionable insights for project managers. This research provides a robust decision-making framework for balancing inventory costs, ordering costs, and project durations in space-constrained environments. Managerial implications include optimizing ordering strategies based on storage capacity and cost parameters.

BuildingsVol. 15(7)
Kasetsart University (TH)
Openalex Percentile: Top 8%
Advanced Manufacturing and Logistics Optimization
3.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Triple-Layer Genetic Algorithm (3LGA) for Project Scheduling and Material Ordering Problem with Limited Storage Space — Narongrit Wongwai, Suphawut Malaikrisanachalee, et al. · Buildings (2025) | TGRS Research Map | TGRS