A Robotic Design Framework for Phase Verification of Overhead Power Transmission Lines

Electrical phase verification identifies the phase reference between three phases in two different power transmission systems. Conventional phase verification of overhead lines requires several workers to climb up, then, hang and hook the phase detector sticks to the overhead lines. Manual operations lead to power outages and increase the risk of workers falling from height or being electrocuted. This study investigated a self‐insulated rope‐driven mechanism framework to hook up and take off a phase detector on the transmission line. The framework balances robotic dynamic stability performance during high‐altitude operations and ensures that phase verification operations can be performed efficiently without power interruptions. The stability of the proposed framework was analyzed under external wind disturbances and collisions. Finally, experiments are conducted to verify the accuracy of the analysis and the feasibility of the scheme. Simulations and experiments show that the proposed robot is capable of lifting phase detector sticks up to a height of 8.6 m, while the maximum wind speed is 7 m/s and the maximum collision force is 6.7 N.

Authors

Institutions

Publication Details

Journal
Journal of Robotics
Published
2025-01-01
DOI
https://doi.org/10.1155/joro/7301970
Primary Topic
Power Line Inspection Robots
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Robotic Design Framework for Phase Verification of Overhead Power Transmission Lines

Yujing Zhang, Yangyang Li, Tong Chen, Jiahong He et al.
Journal of Robotics
Power Line Inspection Robots
article

A Robotic Design Framework for Phase Verification of Overhead Power Transmission Lines

Yujing Zhang, Yangyang Li, Tong Chen, Jiahong He, Zhunian Wang
article en

Abstract

Electrical phase verification identifies the phase reference between three phases in two different power transmission systems. Conventional phase verification of overhead lines requires several workers to climb up, then, hang and hook the phase detector sticks to the overhead lines. Manual operations lead to power outages and increase the risk of workers falling from height or being electrocuted. This study investigated a self‐insulated rope‐driven mechanism framework to hook up and take off a phase detector on the transmission line. The framework balances robotic dynamic stability performance during high‐altitude operations and ensures that phase verification operations can be performed efficiently without power interruptions. The stability of the proposed framework was analyzed under external wind disturbances and collisions. Finally, experiments are conducted to verify the accuracy of the analysis and the feasibility of the scheme. Simulations and experiments show that the proposed robot is capable of lifting phase detector sticks up to a height of 8.6 m, while the maximum wind speed is 7 m/s and the maximum collision force is 6.7 N.

Journal of RoboticsVol. 2025(1)
State Grid Corporation of China (China) (CN), Southeast University (BD), Shanghai Electric (China) (CN), Southeast University (CN)
State Grid Jiangsu Electric Power
Openalex Percentile: Top 95%
Power Line Inspection Robots
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.