Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration

This study examines the effectiveness of project implementation by evaluating the impact of Critical Chain Project Management (CCPM), Building Information Modeling (BIM), and the Last Planner System (LPS) on contractor performance and the timeliness of high-rise building projects. Effective scheduling is crucial in construction, as it aims to minimize process time, waiting time, and inventory levels while ensuring the efficient use of resources. The research is motivated by the frequent delays observed in high-rise building projects during the construction phase. The study employed SPSS to analyze data, revealing that the combined use of CCPM, BIM, and LPS significantly improves contractor performance and project implementation time, with a p-value of 0.000, indicating a strong influence. Specifically, the application of the CCPM method reduced the project timeline from 314 days to 235 days, achieving a 33.4% optimization in time. Additionally, the use of BIM 3D modeling facilitated rapid visualization of building progress across different floors, while the implementation of the LPS method improved the Percent Plan Completed (PPC) value from below 70% to 89.49%. The findings suggest that employing these methods enhances the accuracy of project timelines and reduces delays, offering valuable insights into improving construction project management practices.

Authors

Institutions

Publication Details

Journal
Eduvest - Journal Of Universal Studies
Published
2025-03-20
DOI
https://doi.org/10.59188/eduvest.v5i3.1754
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration

Agus Suroso, Mawardi Amin, Franrizka Ariza
Eduvest - Journal Of Universal Studies
BIM and Construction Integration
article

Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration

Agus Suroso, Mawardi Amin, Franrizka Ariza
article en

Abstract

This study examines the effectiveness of project implementation by evaluating the impact of Critical Chain Project Management (CCPM), Building Information Modeling (BIM), and the Last Planner System (LPS) on contractor performance and the timeliness of high-rise building projects. Effective scheduling is crucial in construction, as it aims to minimize process time, waiting time, and inventory levels while ensuring the efficient use of resources. The research is motivated by the frequent delays observed in high-rise building projects during the construction phase. The study employed SPSS to analyze data, revealing that the combined use of CCPM, BIM, and LPS significantly improves contractor performance and project implementation time, with a p-value of 0.000, indicating a strong influence. Specifically, the application of the CCPM method reduced the project timeline from 314 days to 235 days, achieving a 33.4% optimization in time. Additionally, the use of BIM 3D modeling facilitated rapid visualization of building progress across different floors, while the implementation of the LPS method improved the Percent Plan Completed (PPC) value from below 70% to 89.49%. The findings suggest that employing these methods enhances the accuracy of project timelines and reduces delays, offering valuable insights into improving construction project management practices.

Eduvest - Journal Of Universal StudiesVol. 5(3)
Mercu Buana University (ID)
Openalex Percentile: Top 95%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration — Agus Suroso, Mawardi Amin, et al. · Eduvest - Journal Of Universal Studies (2025) | TGRS Research Map | TGRS