Crew scheduling optimization considering time cost for metro loop lines with multiple relief points

To realize the flexible optimization of large-scale crew scheduling problem in the context of a metro loop line with multiple relief points, a normalized set covering model considering duty number, unnecessary working time and deadhead time is established. The problem is then decomposed by the DW decomposition. An FMD-BP algorithm based on the branch and price framework is proposed, which integrates the Ryan and Foster branching strategy and a multi-start shortest path algorithm well. Case analysis shows that the algorithm proves efficient in solving the proposed model. Allowing deadheads can help lower duty number and total cost, and considering deadhead cost in the model can help reduce deadhead time and further the reduction of total cost. Ideal duty number and work efficiency can be achieved by adjusting parameters in the time cost function. For the test loop line, the holistic scheduling results prove better than when the inner and outer loops are scheduled separately in terms of the total cost, and duty number when prohibiting deadheads, and total deadhead and unnecessary working time when allowing deadheads. Moreover, the holistic scheduling, while allowing deadheads and considering deadhead cost, proves to achieve the best scheduling plans for the test metro loop line.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-03-01
DOI
https://doi.org/10.1049/icp.2025.0442
Primary Topic
Air Traffic Management and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Crew scheduling optimization considering time cost for metro loop lines with multiple relief points

Peng Du, Shiwei He
IET conference proceedings.
Air Traffic Management and Optimization
article

Crew scheduling optimization considering time cost for metro loop lines with multiple relief points

Peng Du, Shiwei He
article en

Abstract

To realize the flexible optimization of large-scale crew scheduling problem in the context of a metro loop line with multiple relief points, a normalized set covering model considering duty number, unnecessary working time and deadhead time is established. The problem is then decomposed by the DW decomposition. An FMD-BP algorithm based on the branch and price framework is proposed, which integrates the Ryan and Foster branching strategy and a multi-start shortest path algorithm well. Case analysis shows that the algorithm proves efficient in solving the proposed model. Allowing deadheads can help lower duty number and total cost, and considering deadhead cost in the model can help reduce deadhead time and further the reduction of total cost. Ideal duty number and work efficiency can be achieved by adjusting parameters in the time cost function. For the test loop line, the holistic scheduling results prove better than when the inner and outer loops are scheduled separately in terms of the total cost, and duty number when prohibiting deadheads, and total deadhead and unnecessary working time when allowing deadheads. Moreover, the holistic scheduling, while allowing deadheads and considering deadhead cost, proves to achieve the best scheduling plans for the test metro loop line.

IET conference proceedings.Vol. 2024(35)
Beijing Jiaotong University (CN)
Climate action
Openalex Percentile: Top 93%
Air Traffic Management and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.