Risk assessment of highway over-limit cargo transportation based on FTA and FBN

Highway over-limit cargo transportation significantly increases the probability of traffic accidents due to its complexity and potential dangers, requiring urgent control through scientific and effective risk assessment methods. In this paper, an fault tree model for over-limit cargo transportation is developed from four perspectives: human, machine, environment, and control, then mapped to a fuzzy Bayesian network, with triangular fuzzy numbers introduced to calculate prior probabilities. By using GeNIe software to construct and evaluate the fuzzy Bayesian network model, the main risk factors and their degrees of influence are identified through two-way reasoning, and targeted risk management countermeasures are proposed. This study not only enriches the risk assessment methods for highway over-limit cargo transportation, but also provides a scientific basis for risk control in practical transportation processes.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-03-01
DOI
https://doi.org/10.1049/icp.2025.0432
Citations
1
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
1.40
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk assessment of highway over-limit cargo transportation based on FTA and FBN

Wu Ge, Hongmei Shan, Hongxi Di, Jinpeng Li et al.
1 citations
IET conference proceedings.
Risk and Safety Analysis
1.40
article

Risk assessment of highway over-limit cargo transportation based on FTA and FBN

Wu Ge, Hongmei Shan, Hongxi Di, Jinpeng Li, Mengzhen Cheng
article en
1 citations

Abstract

Highway over-limit cargo transportation significantly increases the probability of traffic accidents due to its complexity and potential dangers, requiring urgent control through scientific and effective risk assessment methods. In this paper, an fault tree model for over-limit cargo transportation is developed from four perspectives: human, machine, environment, and control, then mapped to a fuzzy Bayesian network, with triangular fuzzy numbers introduced to calculate prior probabilities. By using GeNIe software to construct and evaluate the fuzzy Bayesian network model, the main risk factors and their degrees of influence are identified through two-way reasoning, and targeted risk management countermeasures are proposed. This study not only enriches the risk assessment methods for highway over-limit cargo transportation, but also provides a scientific basis for risk control in practical transportation processes.

IET conference proceedings.Vol. 2024(35)
Xi'an University of Science and Technology (CN), Xi’an University of Posts and Telecommunications (CN)
Openalex Percentile: Top 18%
Risk and Safety Analysis
1.40
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.