Analysis of Waste in the Production System with the Approach Lean Manufacturing Method

Improving the production process needs to be done continuously and continuously in order to minimize all activities that consume time but do not contribute directly to the value of the products produced. PT Cipta Oggi is a manufacturing company that makes furniture products which has a major problem, namely the low value of Process Cycle Efficiency, which the company should have a PCE value of at least 50%. The use of lean manufacturing methods with the help of VSM is used to reduce waste in order to increase the PCE value. There are 22 non-added value activities with a time range of 427 minutes that can be cut. Where the production time was originally 1353 minutes to 926 minutes which had an impact on increasing Process Cycle Efficiency which was originally 46.8% to 68.4%. Based on Failure Mode and Effect Analysis (FMEA), it is known that the main root cause that has the highest RPN value is the Overprocessing waste with a score of 420 and the proposed improvements in order to reduce this waste are the need for safe storage management that can reduce the risk of damage to goods which requires additional processes, namely rework and additional human resources are needed in the inspection process in order to reduce the number of rework.

Authors

Institutions

Publication Details

Journal
Journal La Multiapp
Published
2025-03-24
DOI
https://doi.org/10.37899/journallamultiapp.v6i2.1999
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Waste in the Production System with the Approach Lean Manufacturing Method

P. P. Utomo, Endang Pudji
Journal La Multiapp
Management and Optimization Techniques
article

Analysis of Waste in the Production System with the Approach Lean Manufacturing Method

P. P. Utomo, Endang Pudji
article en

Abstract

Improving the production process needs to be done continuously and continuously in order to minimize all activities that consume time but do not contribute directly to the value of the products produced. PT Cipta Oggi is a manufacturing company that makes furniture products which has a major problem, namely the low value of Process Cycle Efficiency, which the company should have a PCE value of at least 50%. The use of lean manufacturing methods with the help of VSM is used to reduce waste in order to increase the PCE value. There are 22 non-added value activities with a time range of 427 minutes that can be cut. Where the production time was originally 1353 minutes to 926 minutes which had an impact on increasing Process Cycle Efficiency which was originally 46.8% to 68.4%. Based on Failure Mode and Effect Analysis (FMEA), it is known that the main root cause that has the highest RPN value is the Overprocessing waste with a score of 420 and the proposed improvements in order to reduce this waste are the need for safe storage management that can reduce the risk of damage to goods which requires additional processes, namely rework and additional human resources are needed in the inspection process in order to reduce the number of rework.

Journal La MultiappVol. 6(2)
University of Pembangunan Nasional Veteran Jawa Timur (ID)
Openalex Percentile: Top 93%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Waste in the Production System with the Approach Lean Manufacturing Method — P. P. Utomo, Endang Pudji · Journal La Multiapp (2025) | TGRS Research Map | TGRS