Evaluation of Cost Performance In The Surabaya-Gempol Toll Road Reconstruction Project Using Schedule Variance (SV) and Cost Variance (CV) Analysis

The reconstruction of the Surabaya-Gempol Toll Road underscores the critical role of effective project management in large-scale infrastructure projects, particularly in ensuring time and cost efficiency. This study employs the Earned Value Method (EVM) to evaluate project performance through the analysis of Schedule Variance (SV) and Cost Variance (CV). These indicators provide a comprehensive assessment of the project's adherence to its planned schedule and budget. The findings reveal that the project faced initial schedule delays due to logistical and technical challenges, resulting in negative SV values during the early weeks. These delays were primarily caused by weather conditions, late material deliveries, and coordination issues among project stakeholders. However, corrective measures, including extended working hours, additional labor deployment, and optimized scheduling, successfully addressed these issues, leading to positive SV values towards the end of the project. The CV analysis highlighted consistent cost efficiency throughout the project. Positive CV values dominated the majority of the timeline, reflecting effective cost control and resource management. Despite minor cost deviations due to unanticipated repairs and equipment maintenance, the project demonstrated an ability to maintain overall financial performance within the budget framework. This study emphasizes the significance of data-driven decision-making and proactive variance management in achieving project goals. By leveraging SV and CV analyses, infrastructure projects can better anticipate potential issues, implement timely corrective actions, and improve overall performance. The results of this research offer valuable insights for managing similar large-scale projects, contributing to enhanced efficiency and sustainable development in Indonesia's infrastructure sector.

Authors

Institutions

Publication Details

Journal
Asian Journal of Social and Humanities
Published
2025-03-22
DOI
https://doi.org/10.59888/ajosh.v3i6.521
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Cost Performance In The Surabaya-Gempol Toll Road Reconstruction Project Using Schedule Variance (SV) and Cost Variance (CV) Analysis

Budi Witjaksana, Hanie Teki Tjendani, A. Hadian Pratama Hamzah
Asian Journal of Social and Humanities
Value Engineering and Management
article

Evaluation of Cost Performance In The Surabaya-Gempol Toll Road Reconstruction Project Using Schedule Variance (SV) and Cost Variance (CV) Analysis

Budi Witjaksana, Hanie Teki Tjendani, A. Hadian Pratama Hamzah
article en

Abstract

The reconstruction of the Surabaya-Gempol Toll Road underscores the critical role of effective project management in large-scale infrastructure projects, particularly in ensuring time and cost efficiency. This study employs the Earned Value Method (EVM) to evaluate project performance through the analysis of Schedule Variance (SV) and Cost Variance (CV). These indicators provide a comprehensive assessment of the project's adherence to its planned schedule and budget. The findings reveal that the project faced initial schedule delays due to logistical and technical challenges, resulting in negative SV values during the early weeks. These delays were primarily caused by weather conditions, late material deliveries, and coordination issues among project stakeholders. However, corrective measures, including extended working hours, additional labor deployment, and optimized scheduling, successfully addressed these issues, leading to positive SV values towards the end of the project. The CV analysis highlighted consistent cost efficiency throughout the project. Positive CV values dominated the majority of the timeline, reflecting effective cost control and resource management. Despite minor cost deviations due to unanticipated repairs and equipment maintenance, the project demonstrated an ability to maintain overall financial performance within the budget framework. This study emphasizes the significance of data-driven decision-making and proactive variance management in achieving project goals. By leveraging SV and CV analyses, infrastructure projects can better anticipate potential issues, implement timely corrective actions, and improve overall performance. The results of this research offer valuable insights for managing similar large-scale projects, contributing to enhanced efficiency and sustainable development in Indonesia's infrastructure sector.

Asian Journal of Social and HumanitiesVol. 3(6)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 93%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.