Cost and Time Efficiency Through The Application of Value Engineering In The Construction of an ASN Flat Building In Seram Bagian Barat Regency

This research employs the Value Engineering (VE) method to address these challenges, focusing on high-impact work items such as formwork, floor slabs, walls, and structural elements. Utilizing techniques like Work Breakdown Structure (WBS) and Function Analysis System Technique (FAST), the study systematically evaluates opportunities for cost and time savings while maintaining the project’s functional and quality standards. The results demonstrate that the application of knock-down formwork systems significantly reduces material costs and accelerates construction schedules, achieving up to 20% cost savings in specific work items. The use of local materials further contributes to the optimization process, reducing procurement costs and supporting sustainable practices by minimizing environmental impact. Additionally, the redesign of structural components, such as optimized column dimensions, enhances efficiency without compromising safety or functionality. This study underscores the importance of VE as a collaborative and multidisciplinary tool that integrates technical, social, and cultural considerations. It highlights the critical role of stakeholder involvement, particularly in projects with complex socio-cultural dynamics, ensuring practical and acceptable solutions. By illustrating the effectiveness of VE in overcoming constraints, this research provides a valuable framework for applying VE in future infrastructure projects, especially in areas with similar challenges.

Authors

Institutions

Publication Details

Journal
Devotion Journal of Research and Community Service
Published
2025-03-22
DOI
https://doi.org/10.59188/devotion.v6i3.25434
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost and Time Efficiency Through The Application of Value Engineering In The Construction of an ASN Flat Building In Seram Bagian Barat Regency

Jaka Purnama, Eko Pramono, Budi Witjaksana
Devotion Journal of Research and Community Service
Value Engineering and Management
article

Cost and Time Efficiency Through The Application of Value Engineering In The Construction of an ASN Flat Building In Seram Bagian Barat Regency

Jaka Purnama, Eko Pramono, Budi Witjaksana
article en

Abstract

This research employs the Value Engineering (VE) method to address these challenges, focusing on high-impact work items such as formwork, floor slabs, walls, and structural elements. Utilizing techniques like Work Breakdown Structure (WBS) and Function Analysis System Technique (FAST), the study systematically evaluates opportunities for cost and time savings while maintaining the project’s functional and quality standards. The results demonstrate that the application of knock-down formwork systems significantly reduces material costs and accelerates construction schedules, achieving up to 20% cost savings in specific work items. The use of local materials further contributes to the optimization process, reducing procurement costs and supporting sustainable practices by minimizing environmental impact. Additionally, the redesign of structural components, such as optimized column dimensions, enhances efficiency without compromising safety or functionality. This study underscores the importance of VE as a collaborative and multidisciplinary tool that integrates technical, social, and cultural considerations. It highlights the critical role of stakeholder involvement, particularly in projects with complex socio-cultural dynamics, ensuring practical and acceptable solutions. By illustrating the effectiveness of VE in overcoming constraints, this research provides a valuable framework for applying VE in future infrastructure projects, especially in areas with similar challenges.

Devotion Journal of Research and Community ServiceVol. 6(3)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 93%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost and Time Efficiency Through The Application of Value Engineering In The Construction of an ASN Flat Building In Seram Bagian Barat Regency — Jaka Purnama, Eko Pramono, et al. · Devotion Journal of Research and Community Service (2025) | TGRS Research Map | TGRS