Fusing multiple source data for foundation excavation risk assessment based on cloud model and Dempster Shafer evidence theory

Limited data from single source pose a significant constraint on the accuracy of risk assessment conducted during the pre-excavation feasibility analysis stage. In order to address this issue, a risk assessment method that integrates cloud model (CM) with Dempster-Shafer (D-S) evidence theory is proposed. This method carefully selects multi-source risk evaluation indicators from project information and three-dimensional finite element numerical results to create project database and numerical database. By leveraging these databases, the CM generates the membership degrees for various evaluation indicators across different risk levels, which are then transformed into basic probability assignments within the D-S evidence theory. This allows for effective fusion of multi-source risk evaluation indicators achieving comprehensive quantitative evaluation of excavation. A narrow and elongated foundation project is assessed with a risk level of IV (safety) by the proposed approach. The outcomes provide a scientific basis for formulating preventive strategies and managerial decisions about foundation excavation during the pre-excavation.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2025-03-22
DOI
https://doi.org/10.1038/s41598-025-94628-4
Citations
3
Primary Topic
Advanced Decision-Making Techniques
Type
article
Field-Weighted Citation Impact
9.74
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fusing multiple source data for foundation excavation risk assessment based on cloud model and Dempster Shafer evidence theory

Liuyang Li, Haoyuan Gao, Zhihao Luo, Yandong He et al.
3 citations
Scientific Reports
Advanced Decision-Making Techniques
9.74
article

Fusing multiple source data for foundation excavation risk assessment based on cloud model and Dempster Shafer evidence theory

Liuyang Li, Haoyuan Gao, Zhihao Luo, Yandong He, Yue An
article en
3 citations

Abstract

Limited data from single source pose a significant constraint on the accuracy of risk assessment conducted during the pre-excavation feasibility analysis stage. In order to address this issue, a risk assessment method that integrates cloud model (CM) with Dempster-Shafer (D-S) evidence theory is proposed. This method carefully selects multi-source risk evaluation indicators from project information and three-dimensional finite element numerical results to create project database and numerical database. By leveraging these databases, the CM generates the membership degrees for various evaluation indicators across different risk levels, which are then transformed into basic probability assignments within the D-S evidence theory. This allows for effective fusion of multi-source risk evaluation indicators achieving comprehensive quantitative evaluation of excavation. A narrow and elongated foundation project is assessed with a risk level of IV (safety) by the proposed approach. The outcomes provide a scientific basis for formulating preventive strategies and managerial decisions about foundation excavation during the pre-excavation.

Scientific ReportsVol. 15(1)
Tongji University (CN), Dongbei University of Finance and Economics (CN), China Construction Eighth Engineering Division (China) (CN)
Climate action
Openalex Percentile: Top 3%
Advanced Decision-Making Techniques
9.74
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.