Dynamic Step Size Based Maximum Power Point Tracking in PV Systems

The traditional maximum power point tracking (MPPT) algorithms operates with a fixed value of the step size, this operation causes a delayed convergence and more power variations in the MPPT process. The updating of the step size with the distance of operating point from the maximum power point (MPP) helps in controlling the algorithm convergence time. To solve this problem, in this paper, incremental conductance algorithm is modified with the inclusion of dynamic value of step size. In the proposed work, a dynamic step size based incremental conductance (DSINC) algorithm is coined, the step size of this algorithm is not fixed but depends upon the distance of operating point from the MPP, this results in a high value of step size at a point away from MPP and a small value at the point close to the MPP. The implementation of algorithm is carried out on a simple photovoltaic (PV) system consisting of dc-dc converter. The working of the DSINC is compared with the traditional INC to draw a general comparison, the results are obtained by simulating the PV system model in the Simulink platform of the MATLAB.

Authors

Institutions

Publication Details

Published
2024-10-04
DOI
https://doi.org/10.1109/gcat62922.2024.10923918
Primary Topic
Photovoltaic System Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Dynamic Step Size Based Maximum Power Point Tracking in PV Systems

Gaurav Jain, Pankaj Verma, Rachit Saxena, Vaishali Sonwane
Photovoltaic System Optimization Techniques
article

Dynamic Step Size Based Maximum Power Point Tracking in PV Systems

Gaurav Jain, Pankaj Verma, Rachit Saxena, Vaishali Sonwane
article en

Abstract

The traditional maximum power point tracking (MPPT) algorithms operates with a fixed value of the step size, this operation causes a delayed convergence and more power variations in the MPPT process. The updating of the step size with the distance of operating point from the maximum power point (MPP) helps in controlling the algorithm convergence time. To solve this problem, in this paper, incremental conductance algorithm is modified with the inclusion of dynamic value of step size. In the proposed work, a dynamic step size based incremental conductance (DSINC) algorithm is coined, the step size of this algorithm is not fixed but depends upon the distance of operating point from the MPP, this results in a high value of step size at a point away from MPP and a small value at the point close to the MPP. The implementation of algorithm is carried out on a simple photovoltaic (PV) system consisting of dc-dc converter. The working of the DSINC is compared with the traditional INC to draw a general comparison, the results are obtained by simulating the PV system model in the Simulink platform of the MATLAB.

Chandigarh University (IN), Poornima University (IN)
Affordable and clean energy
Openalex Percentile: Top 83%
Photovoltaic System Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.