Justification of Extraction of Ore Reserves under Bottom and in Pitwall Rock Mass Using Cut-and-Fill Method in Transition from Open Pit to Underground Mining in the Artemevsky Mine

The geomechanical evaluation of safety is carried out for structural components of a mining system integrating caving and backfilling in extraction of ore reserves under bottom and in pitwall rock mass. It is found that safe distance between drilling and haulage openings in neighbor stopes depends directly on the height of a mining zone. The need of sequential cutting of drilling and haulage openings in the course of extraction of ore reserves from stopes is proved. The advance of heading operations over actual stoping should be not more than one–two mine openings depending on the rock mass quality. Stoping operations should eliminate formation of any pillars across the width commensurable with the stope or smaller. It is shown that operations in undermined or overmined zones are unsafe. The parameters of structural components which ensure safety of mining are determined.

Authors

Institutions

Publication Details

Journal
Journal of Mining Science
Published
2024-12-01
DOI
https://doi.org/10.1134/s1062739124060115
Citations
2
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.54
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Justification of Extraction of Ore Reserves under Bottom and in Pitwall Rock Mass Using Cut-and-Fill Method in Transition from Open Pit to Underground Mining in the Artemevsky Mine

A. M. Nikol’sky, A. O. Kudrya, A. A. Neverov, S. A. Neverov et al.
2 citations
Journal of Mining Science
Geotechnical and Geomechanical Engineering
0.54
article

Justification of Extraction of Ore Reserves under Bottom and in Pitwall Rock Mass Using Cut-and-Fill Method in Transition from Open Pit to Underground Mining in the Artemevsky Mine

A. M. Nikol’sky, A. O. Kudrya, A. A. Neverov, S. A. Neverov, Yu. N. Shaposhnik
article en
2 citations

Abstract

The geomechanical evaluation of safety is carried out for structural components of a mining system integrating caving and backfilling in extraction of ore reserves under bottom and in pitwall rock mass. It is found that safe distance between drilling and haulage openings in neighbor stopes depends directly on the height of a mining zone. The need of sequential cutting of drilling and haulage openings in the course of extraction of ore reserves from stopes is proved. The advance of heading operations over actual stoping should be not more than one–two mine openings depending on the rock mass quality. Stoping operations should eliminate formation of any pillars across the width commensurable with the stope or smaller. It is shown that operations in undermined or overmined zones are unsafe. The parameters of structural components which ensure safety of mining are determined.

Journal of Mining ScienceVol. 60(6)
Institute of Mining (RU)
Openalex Percentile: Top 37%
Geotechnical and Geomechanical Engineering
0.54
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.